My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/31/2000 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2000
>
05/31/2000 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 1:48:09 PM
Creation date
7/29/2014 10:26:37 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
05/31/2000
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL BOARD MEETING MAY 31, 2000 <br />APPROVAL OF AGENDA <br />In consideration of audience members, Asleson requested that Agenda Item 6A be considered <br />following Item 4. The Board agreed. <br />The following items were added to the meeting agenda: <br />8A. Tree Mitigation Negotiations <br />8B. Landscape Ordinance <br />8C. Lighting Ordinance <br />The agenda was approved as amended above. <br />CITIZEN COMMENTS <br />Asleson noted the attendance of Nancy Klebba, interested reside and Naturalist at Tamarack <br />Nature Center. No other comments were made. <br />PROJECT REVIEW <br />A. GM Development / Apollo Drive CUP / Stockpi - Asleson explained the Apollo <br />Business District is located on Apollo Dri a gra ng area consideration is just south <br />and west of the Correctional Facility. He nip£ tier from John Johnson, engineering <br />consultant for G.M. Development h de ribes the project request. G.M. <br />Development would like to sto . � <br />p � e '" base material in an existing borrow pit on <br />the northeast corner, fill an e d drainage swale, build a new pond and swale <br />(includes a length of pipe rface elevations on the south side of the project, <br />and build a berm on the e <br />John Johnson, engineer for the pplicant, presented an explanation of the background of <br />the Apollo Business District and their attempt to develop the site. He explained that due <br />to the low elevation, they believe they have lost several potential sales. Because of that, <br />they are proposing a grading plan to import soils to bring the elevation up to a higher <br />level. Mr. Johnson stated they would like to begin that process to import soils and also <br />plan to undertake the drainage solutions necessary to serve this property, except for the <br />far western edge. He stated they made application to the City to begin initial stockpiling <br />which can be done up to 5,000 yards per parcel and then applied for a SUP to conduct the <br />necessary grading and to exceed more than 5,000 yards. <br />Mr. Johnson presented the proposed grading plan and explained the elevation changes <br />that would occur. He requested the Environmental Board's review of this preliminary <br />grading plan and to put into place drainage elements. Mr. Johnson reviewed the direction <br />of drainage, existing storm sewer system, and NURP ponds. He stated they are <br />attempting to install a good drainage system and understand staff has some different ideas <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.