Laserfiche WebLink
APOLLO DRIVE <br />78' 101s" <br />FND. RLS <br />PT. 9808 <br />• <br />51' -10 <br />15' -0" PARKING FRONT YARD SETBACK <br />1-50'-0" BUILDING FRONT YARD SETBACK <br />Proposed Site for North American <br />Composites Hazardous Materials <br />Storage Facility <br />1 <br />R30' -0" <br />E <br />TYPICAL <br />CONC. PAD <br />5' -4" x 4' -0" <br />21.33 SF' <br />11 <br />11 <br />5' -0" PARKING <br />SIDE YARD SETBACK >I <br />30• -0' SIDE YARD SETBACK <br />(as required by UBC 503.4.5.2) I <br />LOCATION of 40' -0' wide x <br />60' -0" long SHARED —USE <br />SITE ACCESS ROAD <br />CENTERED on P /L. <br />5' -0" PARKING SIDE YARD SETBACK <br />30' -0" BUILDING SETBACK <br />PROPOSED 1.5 STORY <br />STORAGE /OFFICE BUILDING <br />24,982 SF <br />(Fin. Flr. EL: 907.15') <br />II!IItli <br />1111111 • <br />tLVFILTRATION <br />REA. SEE <br />ADING PLAN <br />\\ \111 /, - - <br />- -' <br />/, <br />i <br />Preliminary Site Plan <br />i <br />P/L <br />RECEIVED <br />SEP 1 1 2000 <br />CITY OF LINO LAKES <br />Scale : 1" = 20' -0" <br />Project North <br />Apollo Business Park <br />Scale : 1" = 400' -0" <br />SCHEDULE of DRAWINGS <br />01.1 Preliminary Site Plan <br />a1.2 Preliminory Site Paving Plon <br />02.1 Building Floor Plan; Primary Elevation <br />a3.1 Exterior Elevations <br />c1.1 Preliminary Site Grading Plan <br />c1.2 Preliminary Site Utilities Plan <br />L1.1 Landscaping Plan <br />- -- Certificate of Site Survey Drawing <br />R E Q U I R E D P A R K I N G <br />OFFICE AREA <br />3,000 SF — 10% = 2,700 SF <br />3 STALLS <br />+ (2,700 SF x 1 STALL /200 SF) = 13.5 STALLS <br />17 STALLS <br />WAREHOUSING AREA <br />22,000 SF — 10% = 19,800 SF <br />19,800 SF x 1 STALL /2,000 SF = <br />TOTAL PARKING REQUIRED = <br />(25) 9'x18' PARKING STALLS <br />(21 9'x18' ACCESSIBLE STALLS <br />(27) PARKING STALLS <br />10 STALLS <br />27 STALLS <br />S I T E C O V E R A G E <br />Property Area = 104,253 SF (2.393 Acres) <br />104,253 SF x .60 (60% Impervious) <br />= 62,518 SF Impervious Surfaces Allowed <br />Building <br />Parking /Service Yard <br />Pat io /Walks <br />TOTAL HARD SURFACES <br />24,982 SF <br />31,068 SF <br />1 100 SF <br />57,150 SF (54.48 %) <br />RECYCLING AREA <br />Recycling Soace Reauired <br />Office 3,000 SF x .0025 = 7.5 SF <br />Warehouse 22,000 SF x .001 = 22.0 SF <br />Recycling Area = 30 SF <br />Site Data <br />North <br />David J. Kelly <br />Architect, Inc. <br />Alt, ee, WS Vest wm St <br />sr.".mss. ew=- 95124 <br />ux5 <br />9ee -2221 <br />Consultants <br />Certification <br />I newly certify WWI Ira omot <br />wtowtar. -en <br />sr w situ at ,ta"ntt <br />SW/ Joseph Kelly <br />Reg. No : <br />Comm. No. :00.031 <br />Drown By : Kelly <br />Dote Issued :09,11,2000 <br />Revisions • <br />Project <br />A New Distribution <br />Office /Warehouse <br />for North American <br />Composites, Co. <br />Apollo Business Center <br />Apollo Drive <br />Uno Lakes, Mn <br />Drawing Title <br />Preliminory <br />Site Pion <br />Scale As Noted <br />Sheet Number <br />far SIto Rat Rn11ew Only <br />dated 09.11.2000 <br />Not for Canetruetton <br />ale1 <br />