Laserfiche WebLink
• proposal, as well as specific modals on surface water treatment, and <br />information on structural soil use has been given to the developers. <br />• <br />• <br />• Streetscape design and alternative transportation access need to be effective. <br />• Very expensive commercial property <br />• Developer has hired a reputable environmental consultant as part of their <br />team. <br />• Attraction of "Green Industry" <br />• Greenway design <br />Environmental Issues: The following identifies potential impacts to Environment. <br />• large impervious surface /Lake water quality impact concerns. <br />• oak woodland to south and miscellanius recentlydeveloped tree areas to north. <br />• Several prairie and savanna areas previously identified by AES on freeway <br />side. <br />• Greenway consideration. <br />COMPREHENSIVE PLAN REFERENCES: Refer to the following references for <br />information that may affect discussions related to this issue. <br />Section 2 - Assessment of Needs <br />• Completed by Brauer AES and presently being studied by consultants. <br />Section 3 - Governing Polices <br />• Creating a sustainable landscape <br />requires a broader view that starts with <br />the big picture or vision and moves into <br />a physical plan and set of action steps <br />to achieve that vision. <br />The 20/20 Vision Plan established the philosophical vision for the community that <br />was the starting point for this study. Public response to the study clearly <br />reiterates the ideals defined in the 20/20 plan, which are as follows: <br />"Sustenance of the natural environment of Lino Lakes through the <br />protection and management of the wildlife, habitats, and other natural <br />resources, and to pass on to future residents a community rich in these <br />sources. Future developrrm6 <br />gnomic development and emir <br />include ec <br />rental pro <br />a/ consideration, <br />• Page 2 <br />