My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/28/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
02/28/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2014 4:09:12 PM
Creation date
7/30/2014 11:02:41 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/28/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Description: Give a complete description of the proposed project and ancillary <br />facilities (attach additional sheets as necessary). Emphasize construction and <br />operation methods and features that will cause physical manipulation of the <br />environment or produce wastes. Indicate the timing and duration of construction <br />activities. <br />Ryan Companies, US Inc. is proposing to develop a retail center in the City of Lino <br />Lakes. The development is located in the northwest quadrant of the intersection of <br />Interstate 35W and Lake Drive. The development will replace approximately 40.15 acres <br />of undeveloped land with 332,958 square feet of retail buildings with associated parking <br />areas, including the following: <br />SuperTarget 182,760 square feet <br />Other Flexable Space Retail 150,918 square feet <br />Including all buildings, parking, and roads, the total amount of impervious surface after <br />development is expected to be 28.78 acres. <br />Initial site work and construction is expected to begin June 2001, with the grand opening <br />of the proposed SuperTarget Store scheduled for July 2002. Remaining parcels are <br />expected to be developed by the end of 2005. <br />Provide a 50 or fewer word abstract for EQB use in the EQB Monitor notice: <br />The project consists of a retail center in the City of Lino Lakes located in the northwest <br />quadrant of the intersection of Interstate 35W and Lake Drive. The existing undeveloped <br />land will be replaced with 332,958 square feet of retail buildings. <br />7. Project Magnitude Data: <br />Total Project Area: 40.15 acres <br />Number of Residential Units: unattached 0 attached 0 <br />Commercial /Industrial/Institutional building area (gross floor space): 332,958 sq. ft. <br />Total Square Feet: 332,958 <br />Indicate area of specific uses: <br />Office 0 <br />Manufacturing 0 <br />Retail 332,958 square feet <br />Other Industrial 0 <br />Warehouse 0 <br />Institutional 0 <br />Light Industrial 0 <br />Agricultural 0 <br />PARSONS <br />TRANSPORTATION GROUP <br />Barton•Aachman • De Leuw, Lather, • Steinman <br />Page 5 <br />Town Center Development <br />Draft -Draft EAW....February 1, 2001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.