Mr. William A. T. McCully, P.E. <br />March 10, 2001 <br />Page 2 <br />numbers from Chart 1, post - development conditions will result in less runoff than the existing <br />conditions. Model results are attached. Water quality basins were added to the development <br />plans to treat runoff from the site. These basins are designed to be dry in between storm <br />events and contain the runoff from a 2.5 -inch rainfall. Locations of these basins are shown in <br />Figure 4. These basins also act to control volume runoff from roadways as required. A <br />District Infiltration Worksheet is attached. <br />The interior wetland on site has an open channel outlet with an invert elevation of 889.2. The <br />existing conditions 100 -year flood level is modeled to be 890.1. The proposed outlet of this <br />wetland is a 15 -foot wide broad crested weir at elevation 890.2 with a 4 -foot wide notch 1- <br />foot deep cut in the middle to elevation 889.2. The effective outlet elevation will match the <br />existing outlet elevation (889.2). The top of the weir will act as the emergency overflow. <br />The post- development 100 year flood level is modeled to be 890.2. Basement elevations of <br />the homes around the wetland will have to be set at or above 892.2 according to the above <br />regulations. <br />A 36 -inch equivalent diameter concrete arch pipe with an invert elevation of 888.7 is proposed <br />under the roadway downstream of the weir. The capacity of this pipe with a headwater at <br />890.2 exceeds that of the upstream weir and will not control the level within the wetland under <br />normal conditions. We checked extreme flood conditions by modeling the effect of blocking <br />more than 80 percent of the culvert during a 10 -inch rainfall. The results show that the water <br />elevation within the wetland did not exceed the minimum basement elevations recommended <br />above. <br />We noted a small (7200 sq.ft.) portion of floodplain fill at the northwestern part of the site. <br />We recommend compensating for this fill by an equivalent area of excavation on the <br />southwestern part of the site. <br />Please review the information we have provided. If you have questions or need further <br />information please contact me (952) 881 -3050. Thank you. <br />