Laserfiche WebLink
CITY OF LINO LAKES <br />PLANNING & ZONING BOARD MINUTES <br />B. PUBLIC HEARING, Ryan Companies US, Inc. (Target) Lake Drive, PDO Rezone, <br />Preliminary Plat, Conditional Use & Site Plan Review. <br />Chair Schaps declared the public hearing opened at 6:44 p.m. <br />DATE <br />TIME STARTED <br />TIME ENDED <br />MEMBERS PRESENT <br />MEMBERS ABSENT <br />STAFF PRESENT <br />6:30 P.M. <br />8:15 P.M. <br />Corson, Lane, Rafferty, Schilling, and Schaps <br />Lyden and Zych <br />City Planner Smyser; City Engineer Powell; <br />Planning Coordinator Wyland; <br />Director Wessel; Planning Consultant <br />Sherman <br />Staff presented the application by explaining staff had been working with Ryan Companies, US Inc. <br />on a proposed retail development located in the northeast quadrant of Lake Drive/I -35W Interchange. <br />The main issue raised by staff and discussed by the City Council and Planning and Zoning Board <br />related to the site layout and design and the departure from the Town Center vision. The direction <br />provided through the concept process was to incorporate special pedestrian- oriented design features, <br />as well as some special architectural elements into the proposal with the goal being an "above average <br />shopping center ". <br />Staff presented its analysis of the request, noting the site was currently zoned SC, Shopping Center <br />District. This designation anticipated the development of a single center generally under one <br />ownership. There was no provision in the SC Ordinance to allow zero lot line setbacks for buildings <br />and parking as proposed. In order to accommodate the development as proposed, it was necessary to <br />process the application under the PDO, Planned Development Overlay District. Section 3, Subd. 3 of <br />the Zoning Ordinance required a PDO to allow subdivision of lots for a single building. This process <br />allowed greater flexibility and consequently a more creative and imaginative design. It allowed <br />flexibility in the internal setbacks and in parking for combined uses and was the appropriate means <br />for review of a development of this size and scope. Access to the site was proposed via an extension <br />of Apollo Drive from Lake Drive through the site to 77th Street. An additional access was proposed <br />to Lake Drive approximately 520 feet north of the Apollo access. All accesses with Lake Drive <br />(County Road 23) were subject to the approval of Anoka County. The City Engineer was in the <br />process of conducting a traffic study that would identify which improvements were necessary to <br />accommodate the development. Improvements may include, but were not limited to turn lanes, by- <br />pass lanes and signalization. Design alternatives to deter traffic from using Carole Drive needed to be <br />examined and implemented if necessary. <br />Hapx6 &_Psxpeartov_BoapS Xazt ogS Atvo Aaics6 <br />