My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/25/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
07/25/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 4:27:23 PM
Creation date
7/31/2014 10:03:59 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
07/25/2001
Env Bd Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
302
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF <br />LINO LAS <br />1 0/24/94 <br />Implementation Plan (CIP) <br />General <br />The implementation plan includes identification and prioritization <br />of capital improvements, administration, inspections, permitting, <br />plan amendments and monitoring programs. The high priority <br />items typically require attention within a one- to two -year period <br />or involve projects that have previously been identified. Low <br />priority items will be performed some time within the five -year <br />implementation period. <br />Estimates of capital expenditures have been made for a five -year <br />period. Future anticipated projects are also listed. The <br />Implementation Plan, Table 1, summarizes expenditures per minor <br />watershed. Detailed information on each capital expense included <br />in Table 2 and in the Watershed Data section of the Users Manual. <br />Table 2 describes Capital Improvement Projects that are city -wide <br />and are not specific to any minor watershed. Projects that are <br />located in specific minor watersheds as shown in Figure 1 are <br />described in the Watershed Data section (Tables 4A to 4J). Capital <br />expenditures are also anticipated for such items as coordination <br />with the Watershed District and WMO, performing biannual <br />drainage system inspections, review and development of <br />ordinances, amendment proceedings and maintenance. The <br />Implementation Plan should be reviewed on an annual basis. At <br />that time, each proposed improvement is to be reconsidered and <br />additional improvements added to the five -year program. <br />Cost Estimates <br />Cost estimates were roughly based on: <br />• Ditch Repair $34,000 /mile <br />• Drainage Studies $15 /acre <br />• Sediment Ponds $50,000 each <br />• Contour Maps $1,500 /quarter section <br />These values were adjusted if it was felt the area had unique <br />features (i.e. high percentage of open water). Sediment ponds <br />were located in watershed that were developed prior to <br />implementation of wetland protection laws. All costs are current <br />dollars and do not include inflation. <br />Local Water Management Plan <br />Users Manual <br />SEH NO: LINOL9402.00 <br />Page 27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.