Laserfiche WebLink
• CITY OF <br />LINO LAKES <br />• <br />10/24/94 <br />Implementation Plan (CIP) <br />All project costs are total project costs. In many cases, the project <br />cost can be shared with RCWD, VLAWMO County and /or State. <br />Once a project is activated, the City will need to determine the <br />actual cost to do the project. <br />Priority <br />Each project identified in the Watershed Data section was assigned <br />a priority of high, low or future. High priority projects are <br />expected to be undertaken within the next 5 years. Low priority <br />projects will be done if funding is available. Future project are <br />improvements or studies that are anticipated. There is no priority <br />assigned to these projects. <br />A time table is also included for each project. Project time table <br />were based on City staff recommendation or in the case of <br />drainage studies when development is likely to occur. There may <br />be cases where a project will be moved up on the time table if <br />development warrants. The capital improvements program will <br />then need to be adjusted to reflect the changes. <br />For drainage studies, a D1 through D8 priority system has been <br />assigned to each future study. A F /D1 has a higher priority then <br />'a' F /D8. Future water quality modeling was assigned a F /Q. <br />Projects with a F /NP have no priority or timetable determination. <br />Local Water Management Plan SEH NO: LINOL9402.00 <br />Users Manual <br />Page 32 <br />