My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/28/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
11/28/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 4:15:54 PM
Creation date
7/31/2014 11:43:43 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
11/28/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 /2b /'/Ji bb: Y4 b1'14b1tl (ytl <br />FROM : NORTH AMERICAN PRRIRIES CO <br />KJULHAUU LNV.K 5LKV F'A(±. 174 <br />PHONE NO. : 320 274 5316 Dec. 19 2800 12:55PM P3 <br />success of the project. Because of the site and condition of this project a <br />ionger.time line should have been drawn into the original plans. The initial <br />time line to install the project' was one season. This was in retrospect, • <br />pushing the limits of what could be effectively done with a site of this <br />magnitude, considering the size of the project area and the massive <br />infestation of hearty exotic and invasive species. <br />. • In the spring of 200l the first task to be performed will be a prescribed turn. <br />After. at period of time has elapsed sufficient to allow re- growth from. seed or <br />residual roots systems, a finial herbicide treatment will.be applied. Anytime <br />• after the final herbicidetreatment all native plant materials will be installed <br />using the most effective method given the precise landscape involved <br />(drilling seed with Truax drill whereever accessible, broadcasting seed when <br />less accessible). After the initial installation. we will monitor the site for. <br />further management issues. <br />I hope the elongated timeline we are now dealing with has not created an <br />inconvenience or caused any problems with any of the parties iinvolved, <br />including, Goren), The city of Lino Lakes or Kjolhaug Environmental. I <br />assure you, although this project may be running longer than originally • <br />thought, it will be completed and completed successfully. If any inembers <br />of the parties noted above need more clarification about this letter,1 would <br />be well disposed to answer any questions. aslc to me regarding any aspect.of . <br />this project. <br />Sincerel <br />Tony Rieger -Borer <br />President <br />
The URL can be used to link to this page
Your browser does not support the video tag.