Laserfiche WebLink
12 /2b /'/Ji bb: Y4 b1'14b1tl (ytl <br />FROM : NORTH AMERICAN PRRIRIES CO <br />KJULHAUU LNV.K 5LKV F'A(±. 174 <br />PHONE NO. : 320 274 5316 Dec. 19 2800 12:55PM P3 <br />success of the project. Because of the site and condition of this project a <br />ionger.time line should have been drawn into the original plans. The initial <br />time line to install the project' was one season. This was in retrospect, • <br />pushing the limits of what could be effectively done with a site of this <br />magnitude, considering the size of the project area and the massive <br />infestation of hearty exotic and invasive species. <br />. • In the spring of 200l the first task to be performed will be a prescribed turn. <br />After. at period of time has elapsed sufficient to allow re- growth from. seed or <br />residual roots systems, a finial herbicide treatment will.be applied. Anytime <br />• after the final herbicidetreatment all native plant materials will be installed <br />using the most effective method given the precise landscape involved <br />(drilling seed with Truax drill whereever accessible, broadcasting seed when <br />less accessible). After the initial installation. we will monitor the site for. <br />further management issues. <br />I hope the elongated timeline we are now dealing with has not created an <br />inconvenience or caused any problems with any of the parties iinvolved, <br />including, Goren), The city of Lino Lakes or Kjolhaug Environmental. I <br />assure you, although this project may be running longer than originally • <br />thought, it will be completed and completed successfully. If any inembers <br />of the parties noted above need more clarification about this letter,1 would <br />be well disposed to answer any questions. aslc to me regarding any aspect.of . <br />this project. <br />Sincerel <br />Tony Rieger -Borer <br />President <br />