My WebLink
|
Help
|
About
|
Sign Out
Home
Search
11/28/2001 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2001
>
11/28/2001 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2014 4:15:54 PM
Creation date
7/31/2014 11:43:43 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
11/28/2001
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(2) Provide sufficient dead storage volume to <br />retain back -to -back 100 -year, twenty- four -hour <br />rainfalls and runoff. <br />(3) Do not create adverse downstream flooding <br />or water quality conditions as a result of <br />increased discharge rate or volume, or other <br />factors. <br />(m) All stormwater management structures and facilities <br />must be properly maintained in perpetuity to assure that <br />they continue to function as originally designed. This <br />maintenance responsibility must be assumed either by the <br />municipality's accepting the required easements dedicated <br />to stormwater management purposes, or by the applicant <br />executing and recording a maintenance agreement <br />acceptable to the District. <br />4. REQUIRED EXHIBITS. The following exhibits must accompany the <br />permit application. One set, full size; two sets, reduced to <br />maximum size of 11 "x17." <br />(a) Property lines and delineation of lands under <br />ownership of the applicant. <br />(b) Delineation of the subwatershed contributing runoff <br />from off -site, proposed and existing subwatersheds on- <br />site, emergency overflows, and drainageways. <br />(c) Proposed and existing stormwater facilities' <br />location, alignment and elevation. <br />(d) Delineation of existing on -site wetland, marshes, <br />shoreland and /or floodplain areas. <br />(e) Identification of existing and proposed normal, and <br />ordinary high and 100 -year water elevations on -site. <br />(f) Identification of existing and proposed site contour <br />elevations related to NGVD, 1929 datum. <br />(g) Construction plans and specifications of all <br />proposed stormwater management, facilities, including <br />design details for outlet control structures. <br />(h) Stormwater runoff volume and rate analyses for the one <br />and 100 -year critical events, existing and proposed <br />conditions. <br />(i) All hydrologic, water quality, and hydraulic <br />computations completed to design the proposed stormwater <br />management facilities. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.