My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/26/2003 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2003
>
02/26/2003 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 10:42:48 AM
Creation date
8/1/2014 11:46:06 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
02/26/2003
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be on site mitigation, then off site mitigation. He then asked about the options they were considering. <br />Wessel responded the County Board was discussing the options, but nothing was decided. <br />Trehus asked for information concerning mitigation on existing park land. <br />Chair Lanyon agreed that they needed to clarify that option. <br />t New site plan and application submitted. <br />t No new EAW information <br />t No new watershed information ie.wetland mitigation plan, surface water <br />plan <br />• No petition for public improvements submitted yet. <br />STAFF COMMENTS /ISSUES FOR CONSIDERATION: <br />t Surface Water issue is still a very critical issue. Proposal shows a <br />wet pond on the North side. There is no information at this time <br />whether sequencing criteria will be met for proposed project, wetland <br />mitigation, surface water management planning will be met. <br />Have requested the developer investigate vegetated depressional areas <br />through the parking lots. <br />tt Grading on the project should direct water to infiltration areas <br />• Have made a sugestion that the 6 foot walkway be changed to a vegetated <br />infiltration area. This should be tiled to allow for excess water to <br />pass on to the next sequential infiltration area <br />t Lighting has not changed except for a change to less spill on the north <br />Environmental ISSUES: <br />tiE See attached reports <br />ENVIRONMENTAL BOARD COMMENTS: The following is a summary of the comments <br />made by the Environmental Board: <br />17apxcr_&_Pezpeartov _Boap5_ Xirzo ltvo_Aareso- <br />
The URL can be used to link to this page
Your browser does not support the video tag.