Laserfiche WebLink
• <br />• <br />Record of Decision <br />City of Lino Lakes <br />1. The City of Lino Lakes concurs with the MPCA comment. Prior to <br />construction of the proposed project the developer /contractor will submit <br />and obtain NPDES and sanitary sewer permit applications and permits. <br />The Metropolitan Council offered the following comments: <br />Metropolitan Council Comments: <br />1. The proposal will remove 0.8 acres of wooded vegetation and increase the <br />lawn /landscaping from 0 to 9.0 acres. Re- landscaping as much of the <br />proposed lawn /landscaping area in native vegetation will benefit water <br />quality and potentially replace some bird and wildlife habitat that will be <br />lost due to the proposed development. Replacing the lost wooded area in <br />native landscaping in the native landscaping areas is also desirable. <br />2. The restoration of the stream banks and an appropriate buffer along <br />County Ditch #10 with native vegetation will benefit water quality. <br />3. The project is just up stream from Rice Creek Chain of Lakes Regional <br />Park Reserve. Preserving and restoring habitat and water quality in the <br />areas surrounding the park will benefit the ecological values in the park <br />reserve, particularly in and around Marshan Lake. <br />4. Staff review concludes that the EAW is complete and accurate with <br />respect to regional concerns and raises no major issues of consistency <br />with Council policies. An EIS is not necessary for regional purposes. <br />Lino Lakes Responses: <br />1. Vegetative filter/buffer strips will be used around portions of the site. <br />According to the Lino Lakes Handbook for Environmental Planning and <br />Conservation Development, filter/buffer strips provide an important <br />function in minimizing erosion, reducing direct runoff of storm water into <br />vulnerable ecological resources, and help sustain wildlife through suitable <br />habitat. <br />2. County Ditch #10 has side slopes approaching 12 percent, therefore, <br />erosion would present a potential hazard to water quality. The stream <br />bank area along County Ditch #10 will not be disturbed by construction, <br />and as noted in #3 will be protected by a conservation easement. <br />3. The proposed development will have the opportunity to minimize impacts <br />to the Rice Creek Chain of Lakes Regional Chain of Lakes. A <br />conservation easement will be dedicated along the County Ditch #10 to <br />preserve the integrity of the drainage corridor. The proposed development <br />