SRF Consulting Group, Inc. <br />for erosion prevention and sediment control during construction include silt fences, <br />temporary seeding and mulching, use of erosion control blankets on 'slopes and coir logs <br />in swales. Permanent ponds will be constructed as early in the project as possible in <br />order to trap sediment during construction. Excess fill material will not be deposited in <br />wetlands or other environmentally - sensitive areas. <br />Construction Implementation Schedule <br />Construction implementation is expected to conform to the following schedule: <br />Table 2: Anticipated Construction Implementation Schedule <br />Date <br />Activity <br />March 2004 <br />Rough grading, pond construction, County <br />Ditch 72 realignment, well drilling <br />March — September 2004 <br />Site grading, parking lot construction, <br />landscaping and permanent vegetation <br />establishment, building shell construction, <br />sanitary system construction, CSAH 21 <br />improvements, utility installation <br />June 2005 — September 2005 <br />Building construction, final landscaping <br />September 2005 <br />Owner Occupancy <br />Responsible Party for Erosion Control Measures <br />Blair Juliar <br />Sheehy Construction Company <br />360 W. Larpenteur Ave <br />St. Paul, MN 55113 <br />Ph. 651- 488 -6691 <br />Certificate of Survey <br />An existing property Certificate of Survey is attached. Please note that County Ditch 72 <br />actual alignment has not been defined on the certificate because field location has not <br />been possible and a record of easement has not been found. The ditch will be physically <br />located during construction. A final certificate of survey granting an easement over the <br />realigned County Ditch 72 to the Rice Creek Watershed District will be issued once <br />construction is complete and actual tile line and ditch alignments are surveyed. <br />H :\ Civil \047 \4443\sent\BWBR \10 -17 -03 \City submittal narrative.doc <br />