Laserfiche WebLink
I GENERAL NOTES <br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE <br />GENERAL CONTRACTOR AND BY CALLING GOPHER STATE ONE CALL (651- 454 -0002) PRIOR TO <br />STAKING PLANT LOCATIONS. <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATIONS WITH OTHER <br />CONTRACTORS WORKING ON SITE. <br />WHERE EXISTING TREES AND /OR SIGNIFICANT SHRUB MASSINGS ARE FOUND ON SITE. <br />WHETHER SHOWN ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED <br />UNLESS NOTED TO BE REMOVED AND /OR ARE IN AN AREA TO BE GRADED. ANY QUESTION <br />REGARDING WHETHER PLANT MATERIAL SHOULD REMAIN OR NOT SHALL BE BROUGHT TO <br />THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO REMOVAL. <br />ALL EXISTING TREES TO REMAIN TO BE FERTILIZED AND PRUNED TO REMOVE DEAD WOOD <br />AND DAMAGED OR RUBBING BRANCHES. <br />5. BB TREES AND SHRUBS ARE BALLED AND BURLAPED. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL 15 REQUESTED <br />OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE <br />SUBMISSION OF A BID AND /OR QUOTATION. <br />re <br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN <br />STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />CONTRACTOR IS RESPONSIBLE FOR ON -GOING MAINTENANCE OF ALL NEWLY INSTALLED <br />MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE <br />WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR. <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE <br />INSPECTION. <br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE <br />LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE <br />MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />11. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CKLENDAR YEAR <br />FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO <br />ADDITIONAL COST TO THE OWNER. <br />IN DECIDUOUS TREE <br />VAPIES <br />24 <br />- 111111 ° <br />Ika-L WIN Pia <br />111111 =1. <br />lU lVlll� Vllll „ww „uuu atWamm, <br />NOTE: <br />TWO ALTERNATE METHODS OF <br />TREE STAKING ARE ILLUSTRATED <br />IT IS THE CONTRACTOR'S OPTION <br />TO STAKE TREES; HOWEVER. THE <br />CONTRACTOR IS RESPONSIBLE FOR <br />MAINTAINING TREES IN A PLUMB <br />POSITION THROUGHOUT THE <br />GUARANTEE PERIOD. <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE EPRIOR TO PLANTING <br />ABOVE ROOT I ED GRADE <br />OR JUST <br />DOUBLE STRAND 14 GA. WIRE - <br />3' 0 120° INTERVALS (TYP.) <br />16" POLYPROPYLENE OR. <br />POLYETHYLENE (40 MIL. 1 -1/2" <br />WIDE STRAP TYP.) <br />TREE WRAP TO FIRST BRANCH <br />FLAGGING - ONE PER WIRE <br />ROOTBALL TO SIT ON SUBGRADE <br />MULCH - " DEEP SHREDDED BARK <br />(UNLESS NOTED OTHERWISE) <br />PLANTING SOIL - SEE SPEC. <br />TOPSOIL <br />SUBGRADE <br />2" X 2" X 24" WOOD STAKE SET <br />AT ANGLE <br />SOD <br />NOTE: <br />THE HOLE FOR PLANTING MUST BE AT LEAST <br />TWICE THE WIDTH OF THE ROOT BALL <br />ALL TREES TO BE PLANTED WITH THE ROOT COLLAR <br />LEVEL OR SLIGHTLY ABOVE GRADE. <br />Islons <br />e: Deseri Lion: <br />Date: <br />Deseri Lion: <br />B. <br />M PLANTING SPECIFICATIONS <br />1. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILLED TO A MINIMUM <br />DEPTH OF 10 ". AMENDMENTS SHALL BE APPLIED AFTER CULTIVATION. <br />2. BACKFILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. <br />REMOVE ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER. <br />3. FERTILIZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH <br />DRIED BONE MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOIL PER <br />THE MANUFACTURER'S INSTRUCTIONS. UNLESS NOTED OTHERWISE. <br />MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANTING <br />BEDS TO 3" DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO <br />RECEIVE 3" DEEP SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER. ALL <br />EVERGREEN AND DECIDUOUS TREES TO RECEIVE 4" DEEP SHREDDED HARDWOOD MULCH <br />WITH NO MULCH IN DIRECT CONTACT WITH TREE TRUNK. <br />5. TREE STAKING: IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO STAKE AND /OR GUY <br />THE TREES ACCORDING TO THE DETAILS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE <br />EVERY STEP NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB <br />CONDITION AT ALL TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY <br />WHERE VANDALISM, SOIL OR WIND CONDITIONS ARE A PROBLEM. <br />6. TREE WRAPPING: WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE <br />PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE <br />FALL PRIOR TO 12 -1 AND REMOVE ALL WRAPPING AFTER 5 -1. <br />7. RODENT PROTECTION: PROVIDE ON ALL TREES. EXCEPT SPRUCE UNLESS OTHERWISE <br />SPECIFIED. <br />8 PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE <br />PLANS. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN OUANTITIES <br />EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. <br />DO NOT SCALE DRAWINGS. <br />9. EDGING: EDGING SHALL BE 4" P.V.C. COMMERCIAL GRADE EDGING WITH THREE (3) METAL <br />ANCHOR STAKES PER 20 FOOT SECTION. ALL MASS PLANTING BEDS SHALL HAVE EDGING <br />PLACED BETWEEN MULCH AREA AND ANY ADJACENT TURF AREA. <br />10. ALL PLANT MATERIAL SHALL BE THOROUGHLY WATERED TWICE DURING THE FIRST 24 -HOUR <br />PERIOD AFTER INSTALLATION. ALL PLANTING SHALL BE THEN WATERED WEEKLY, OR MORE IF <br />NECESSARY. DURING THE FIRST GROWING SEASON. <br />11. ALL PARKING LOT ISLANDS TO RECEIVE A 3" LAYER OF SHREDDED HARDWOOD MULCH. <br />OVER FIBER MAT WEED BARRIER UNLESS OTHERWISE NOTED. <br />N CONIFEROUS TREE <br />NOTES: <br />CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS NOTED OTHERWISE. <br />NO MULCH TO BE IN CONTACT WITH TRUNK. <br />SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. <br />TWO ALTERNATE METHODS OF' TREE STAKING ARE ILLUSTRATED. <br />IT IS THE CONTRACTOR'S OPTION TO STAKE TREES; HOWEVER. THE CONTRACTOR IS <br />RESPONSIBLE FOR MAINTAINING TREES IN A PLUMB POSITION THROUGHOUT THE <br />GUARANTEE PERIOD. ' <br />PLACE ROOT COLLAR AT OR JUST ABOVE FINISHED GRADE. <br />DOUBLE STRAND 14 GA. WIRE, <br />3' ® 120' INTERVALS (TYP.) <br />16" POLYPROPYLENE OR <br />POLYETHYLENE (40 MIL, <br />1 -1/2" WIDE STRAP TYP.) <br />8' -0" STEEL STAKE <br />FLAGGING - ONE PER WIRE <br />ROOTBALL TO SIT ON <br />SUBGRADE <br />MULCH - 4" DEEP <br />SHREDDED BARK (UNLESS NOTED OTHERWISE) <br />PLANTING SOIL - SEE SPEC. <br />TOPSOIL <br />UBGRADE <br />2" X 2" X 24" WOOD STAKE <br />SET AT ANGLE <br />SOD <br />III PLANTING NOTES <br />NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED <br />IN THE IMMEDIATE AREA. <br />ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE <br />ARCHITECT PRIOR TO ANY AND ALL DIGGING. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, <br />SOIL CONDITIONS. OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT <br />PLANT MATERIAL ESTABLISHMENT. SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE <br />DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD. <br />SHOULD AN ADJUSTMENT BE ADVISED. THE LANDSCAPE ARCHITECT MUST BE NOTIFIED. <br />5. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY <br />IDENTIFIED (COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL NOT BE <br />REMOVED PRIOR TO OWNER ACCEPTANCE. <br />7. WHERE SOD /SEED ABUTS PAVED SURFACES, FINISHED GRADE OF'SOD /SEED SHALL BE HELD <br />1" BELOW SURFACE ELEVATION OF TRAIL, SLAB. CURB. ETC. <br />8. S00 SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON <br />SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE <br />GROUND. <br />SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO <br />RECEIVE S00. <br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE <br />OWNER. <br />IN IRRIGATION NOTES <br />L LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SHOP DRAWING <br />ILLUSTRATING AN IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK <br />WHEN BIDDING. THESE SHALL BE REVIEWED BY THE OWNER PRIOR TO ORDERING. <br />2. VERIFY EXISTING /PROPOSED IRRIGATION SYSTEM LOCATION. <br />3. UNLESS OTHERWISE NOTED ALL SOD AND PLANTING AREAS INDICATED ON PLAN SHALL <br />BE 100% IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN <br />PROPERTY LINE AND BACK OF CURB WHERE NEW LANDSCAPE IMPROVEMENTS ARE <br />PROPOSED. <br />4. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL <br />SOD AND PROPOSED LANDSCAPE PLANTINGS ARE IRRIGATED PROPERLY. INCLUDING THOSE AREAS <br />DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION. <br />5. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING /LAWN <br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT <br />MATERIAL GROWTH REQUIREMENTS. <br />IN SHRUB <br />24" <br />NOTE: <br />THE HOLE FOR PLANTING MUST BE AT LEAST <br />TWICE THE WIDTH OF THE ROOT BALL <br />ALL TREES TO BE PLANTED WITH THE ROOT COLLAR <br />LEVEL OR SLIGHTLY ABOVE GRADE. <br />I hereby certify that this plan was prepared by me or under <br />my direct supervision and that I am a Licensed Landscape <br />Architect under the laws of the State of Minnesota. <br />Scott Bilben <br />Date: 5/05/04 <br />Reg Na. 40647 <br />Designed By: <br />SB <br />Drown By <br />Sr <br />Checked Br.. <br />50 <br />15" MIN. <br />= 111111= I1h,.. <br />IIIII- 11111= 11111 111111 = 111111 - 111111-111111-1 <br />NOTE: <br />THE HOLE FOR PLANTING MUST BE AT LEAST <br />TWICE THE WIDTH OF THE ROOT BALL <br />ALL SHRUBS TO BE PLANTED WITH THE ROOT COLLAR <br />LEVEL OR SLIGHTLY ABOVE GRADE. <br />NOTE: <br />HAND LOOSEN ROOTS OF <br />CONTAINERIZED MATERIAL (TYP.) <br />SCARIFY BOTTOM AND SIDES OF <br />HLOLEE PRIOR TO PLANTING <br />ABOVE ROOT COLLAR GRADE <br />OR JUST <br />SHRUBS TO SIT ON SUBGRADE <br />MULCH - 3" DEEP SHREDDED BARK <br />(UNLESS NOTED OTHERWISE) <br />LANDSCAPE FABRIC - SEE SPEC. <br />PLANTING SOIL - SEE SPEC <br />4" P.V.C. EDGING <br />REFER TO PLAN FOR GROUND <br />COVER <br />SUBGRADE <br />CENTERING OF SHRUB IN BED <br />TO TAKE PRECEDENCE OVER <br />DIMENSION FROM EDGE. <br />Schoell & Madson, Inc. <br />Engineering • Surveying • Planning <br />Soil Testing • Environmental Services <br />wnwaachoelmadaoncom <br />00580 Wayzata Boulevard cede 1 554 ThFd Slreet NW, Buts 100 <br />M1m•.PCi0. Minnesota 55305-1525 <br />phase (852) 546 -7601- far (952) 546 -6065 phone: (763) 241-0108 - far- (952) 546 -9065 <br />13c Finer, 88neada 55330.1408 <br />k• <br />Hokanson Development, Inc. <br />9174 Iwtantl Street N.E. <br />Blaine MN. 55434. <br />(7631 786-3130 <br />WARNING: <br />THE CONTRACTOR SHALL CONTACT <br />ALL PUBLIC UTILITIES FOR LOCATIONS <br />OF ALL UNDERGROUND WIRES, CABLES. <br />CONDUITS. PIPES, MANHOLES. VALVES, <br />OR OTHER BURIED STRUCTURES BEFORE <br />DIGGING. HE SHALL REPNR OR REPLACE <br />THE ABOVE WHEN DAMAGED DURING <br />CONSTRUCTION AT NO COST TO OWNER. <br />Project <br />Me shon Townhomos <br />2nd Addtlon <br />Lino Lakes, Minnesota <br />Sheet Me <br />LANDSCAPE DETAILS <br />Date <br />5/05/04 <br />SMI Project .umber: 63508 -004 <br />F:tEN <br />