My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/15/2004 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2004
>
07/15/2004 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 12:19:53 PM
Creation date
8/4/2014 2:24:31 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
07/15/2004
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
V8,1, Agff <br />April 23, 2004 <br />Ed Vaughan <br />1432 Pheasant Hills Drive' <br />Lino Lakes, MN 55038 <br />Post -it' Fax Note 7671 <br />lb - <br />t�G� &r.1 <br />Ca.iDept <br />Date <br />Pnono a <br />Fax <br />From 504 ✓.�,prr <br />co. <br />Plane # <br />Fax <br />re: Bridge, Pheasant Preserve 12th Addition <br />Dear Mr. Vaughan: <br />As You recall, we discussed your bridge �� <br />recounted the status of the EAW. We wed ro� at the April Zl work session. We also <br />to review the bridge in order to make a prepare a list of specific information necessary <br />environmental review <br />the effects. order recommendation on the potential for significant <br />particular, we must be able to assess the potential visual impacts of the <br />bridge as well as other possible impacts. <br />Community Development staff discussed the issue on April 22. Please submit the following <br />information: a" mg <br />Visual representations of the bridge including both an end view and a side view_ These must <br />represent the entire bridge, not just a single span. <br />• Materials: piers/pilings, ' . / <br />rails, support beams, decking etc. )014. - y _ 4 e e„ 74 74 =ildd co,,.� <br />• Dimensions of the bri 4 4. °a' °'° 71' c di, <br />bridge, including: • <br />- elevation of the bottom of the bridge 5 e e q/rk ;7 <br />- elevation of the top of the rat or the <br />- width of' the he both the drive highest elements if ligher than the rail e <br />bridge, surface and the en -re bridge (rails and other �.»r`w ; h° <br />elements will make it wider than the driving surface ad <br />- elevations and width of ) ~ ''/:'� �'kF `�Rc ; s i fe 1?dc <br />Pilings/piers vra,s ��-cw: �, / � rSe�/O�ic�l , <br />Increasing the number of piers from one to four likely will require more dewatering than <br />originally pianned. This may require additional review by the g an urc <br />Y MN Dept. of Natural Resources. Se 4t ,044e <br />Please call with any questions at (651)982 -2425. .e 7it'i <br />Sincerel <br />f <br />Jeff Smyser <br />City Planner <br />cc• Mike Grochala <br />Tom Hovey, MnDNR, Division of Waters, I200 Warm Road, St. Paul, M s1 55106 <br />boo Town Center Parkway, Lino Lakes, Minnesota 55014-7182 <br />Phone: 651 - 982_2400 • Fax: 651- 982 -2499 • TDD: 651- 982 -2410 <br />TOTAL P.01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.