My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/15/2004 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2004
>
07/15/2004 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2014 12:19:53 PM
Creation date
8/4/2014 2:24:31 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
07/15/2004
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.1 <br />G <br />7. HOW TO GET TO THE SITE Attach a simple site locator map. If needed, include on the map written directions to the site <br />from a known location or landmark. Include highway and street names and numbers. Also provide distances from known <br />locations and. any other information that would assist in locating the site. Label the sheet SITE LOCATOR MAP. <br />See Narrative <br />8. PURPOSE OF PROJECT: What do you propose to do, and why is it needed? Please be brief. (See HELP 8before <br />completing Ski section,) <br />t See Narrative <br />L` 9. PROPOSED TIMELINE: Approximate project start date: June 1, 2001 <br />Projected end date: June 1, 2002 <br />r 10. PROJECT DESCRIPTION: Describe in detail what you plan to do and how you plan to do it. This is the most important <br />1 pad of your application. See HELP 10 before completing this section; see also What To Include on Plans (Instructions, <br />page 2). If space below is not adequate, attach separate sheet labeled PROJECT DESCRIPTION. <br />See Narrative <br />11. FOOTPRINT OF IMPACT (if applicable): Indicate total amount (in acres or square feet) of wetland(s) or water body <br />area(s) to be filled, drained, inundated or excavated; and/or indicate length of stream or river affected (in linear feet). <br />0.07 acres or 3240 square feet and/or linear feet <br />Wetland will be bridged. Five piers will support the bridge, a total footprint of 3240 square feet. <br />12. TYPE AND ESTIMATED AMOUNT OF MATERIAL(S) TO BE PLACED /NT00R EXC4VATED FROMTHE WETLAND <br />OR WATER BODY (if applicable): List each type of material (such as rock, sand, clay, concrete) to be filled or excavated, <br />and estimate amount in cubic yards. <br />0 FILLING 0 EXCAVATING <br />LiType(s) of material Estimated amount in cubic yards <br />concrete bridge N/A <br />iers <br />Type(s) of material Estimated amount in cubic yards <br />13. ESTIMATED PROJECT COST: $620,000 <br />ri <br />(for determination of DNR fees only, which are based on total project cost) <br />
The URL can be used to link to this page
Your browser does not support the video tag.