Laserfiche WebLink
GAUD Qualification: 1 <br />( <br />N89'58781W I 377.07 <br />BIRCH STREET <br />(C.SAH. NO. 10 <br />901 <br />ROCK ENTRANCE PAD <br />Ai <br />- I 1 <br />L,G_ -I P ^_ <br />, <br />905.5D <br />' 905.50 <br />to <br />to <br />L .• <br />01, <br />902 <br />096 <br />LT FENCE <br />6- <br />£G• <br />589°5828"Ea.P' 376.36 <br />STORM WATER POLLUTION PREVENTION PLAN (SWPPP) <br />GENERAL NOTES: <br />1. THE NATURE OP THIS PROJECT WILL CONSIST OF CONSTRUCTING: <br />FIVE SOME FAMILY LOTS WITH WATERMAN, STORM AND SANITARY 551YER CONNECTIONS. <br />2. THE INTENDED SEOUENCE OF MAJOR CONSTRUCTION ACTIVITIES ARE AS FOLLOWS: <br />L INSTALL STABILIZED ROCK CONSTRUCTION ENTRANCE PAD. <br />2. INSTALL SILT FENCE. <br />3. CLEAR AND GRUB FOR SEDIMENT BASIN. <br />4. CONSTRUCT SEDIMENTATION BASIN. <br />5. CLEAR AND GRUB REMAINDER OF SITE. <br />6. STRIP AND STOCKPILE TOPSOIL. <br />7. ROUGH GRADING OF SITE. <br />B. STABILIZE DENUDED AREAS AND STOCKPILES WITHIN N DAYS OF <br />LAST CONSTRUCTION N THAT AREA. <br />9. INSTALL SANITARY SEWER. WATERMAN, STORM SEWER. AND SERVICES <br />ID. SUB -CUT STREETS, INSTALL STREET SECTION. <br />II. INSTALL CURB AND GUTTER. <br />12. BITUMINOUS ON STREETS <br />13. 5INAL GRADE SITE INSTALL SEED AND MULCH. <br />N. REMOVE ACCUMULATED SEDIMENT FROM BASIN. <br />15. WHEN ALL CONSTRUCTION ACTIVITY IS COMPLETE AND THE SITE IS <br />STABILIZED, REMOVE SILT FENCE AND RESEED ANY AREAS DISTURBED <br />BY THE REMOVAL. <br />3. SITE DATA: <br />AREA 10 BE DISTURBED m 3.00 rm. <br />PRIOR TO POST <br />CONSTRUCTION YEMISTRICTION <br />IdPERVKN? AREA 060 ae D 411 De <br />COIL TYPFO A <br />POST CONSTRUCTION RUNOFF COFFFRXFNT 04.50 <br />4. TIE LOCATION OP AREAS NOT TO BE DISTURBED MUST BE IDENTIFIED WITH FLAGS, <br />STAKES. SKNS. SILT FENCE, ETC. BEFORE CONSTRUCTION BEGINS. <br />5. CONSTRUCTION ACTIVITY - EROSION PREVENTION PRACTICES <br />TIME AN AREA CAN <br />REMAIN OPEN WHEN NOT <br />TYPF OF SI OK PCIIVLY BEING WORKED <br />STEEPER THAN 11 14 DAYS <br />10:1 70 3:1 <br />FLATTER THAN 10.1 21 DAYS <br />DENOTES SLOPES STEEPER THAN 3:1 <br />6. ON SLOPES 3:1 OR GREATER MAINTAIN SHEET FLOW AND MINIMIZE RILLS AND /0R <br />GULLIES. SLOPE LENGTHS CAN NOT BE GREATER THAN 75 FEET. <br />7. ALL STORM DRAINS AND INLETS MUST BE PROTECTED UNTIL ALL SOURCES OF <br />POTENTIAL DISCHARGE ARE STABILIZED. <br />8. TEMPORARY SOIL STOCKPILES MUST HAVE EFFECTIVE SEDIMENT CONTROL AND CAN <br />NOT BE PLACED IN SURFACE WATERS CR STORM WATER CONVEYANCE SYSTEMS. <br />TEMPORARY STOCKPILES WITHOUT SIGNIFICANT AMOUNT O SILT. CLAY. OR ORGANIC <br />COMPOUNDS ARE EXEMPT (EX: CLEAN AGGREGATE STOCK PILES. DEMOLITION CONCRETE <br />STOCKPILES. SAND STOCKPILES). <br />9. SEDIMENT LADEN WATER MUST BE DISCHARGED TO A SEDIMENTATION BASIN <br />WHENEVER P055RLE. IF NOT POSSIBLE_ IT MUST BE TREATED WITH THE APPROPRIATE <br />BLIP'S. l\.Tm1�e <br />10. SOLID WASTE MUST BE DISPOSED Or PROPERLY AND KIST COMPLY WITH MPCA <br />DISPOSAL REDUREMENTS. <br />011. (VNAL OF 7HE WASHINSITE. G OF CONSTRUCTION VEHICLES MUST BE LIMITED TO A DEFINED <br />AR ER <br />12. NO ENDINE DEGREASING IS ALLOWED ON SITE, <br />13. THE OWNER W40 SIGNS THE NPDES PERMIT APPLICATION I5 A 9E9411 0E0 AND IS <br />RESPONSIBLE FOR COMPLIANCE WITH ALL TERMS AND CONDITIONS OF 14E PERMIT. <br />THE OPERATOR (CONTRACTOR) WHO SIGN5 THE NPDES PERMIT APPLICATION 15 A PERMITTEE <br />FOR PARTS 118., PART N.C. AND PART IV. OF THE 490E5 PERMIT AND IS JOINTLY RESPONSIBLE <br />WITH THE OWNER FOR COMPLIANCE WITH THOSE PORTIONS OF THE PERMIT. <br />M. 1.416455 (6 - RA . -UPON COMPLETION OF GRADING. UTILITIES. AND STREET CONSTRUCTION <br />THE NEW OWNER (HOME BIALDE9) MUST SUBMIT A SUBDIVISION REGISTRATION WITHIN 7 DAYS <br />O: ASSUMING OPERATIONAL CONTROL OF THE SITE. COMMENDING WORK ON THEIR PORTION OF <br />THE SITE. OR OF THE LEGAL TRANSFER. SALE OR CLOSING ON THE PROPERTY. NOTF- THE NEW <br />OWNER CAN IMPLEMENT THE ORIGINAL SWPPP CREATED FOR THE PROJECT OR DEVELOP AND <br />IMPLAMENT THEIR OWN SWPPP. <br />15. TERMINATION OF SOVFRA0E- PERMITTEE($) WISHING TO TERMINATE COVERAGE MUST SUBMIT <br />A NOTICE OF TERMINATION (NOT) TO THE MPCA. ALL PERMITTEE(S) MUST SUBMIT A NOT WITHIN <br />3D DAYS AFTER ONE OR MORE OF THE FOLLOWING CONDITIONS HAVE BEEN MET: <br />A. FINAL STABILIZATION. PER 149DES PERMIT PART IV.G. AND DEFINITION IN APPENDIX B <br />HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE FOR WHICH THE PERMITTEE I5 RESPONSIBLE. <br />FINALLY STABILIZED. <br />PERIMETER CONTROL FOR INDIVIDUAL LOTS HAS BEEN COMPLETED AND THE RESIDENCE HAS BEEN <br />TRANSFERRED TO THE HOMEOWNER. ADDITIONALLY. THE PERMITTEE MUST DISTRIBUTE THE MPCA'S <br />BENEFITS OF. FINAL STABILIZATION. <br />R. INSPECTIONS <br />A. INITIAL INSPECTION FOLLOWING SILT FENCE INSTALLATION BY CITY REPRESENTATIVE 15 <br />REOURED. <br />B. EXPOSED SOL AREAS: ONCE EVERY 7 DAYS AND WITHIN 24 HOURS FOLLOWING A <br />0.5' OVER 24 HOURS RAN EVENT. <br />C. STABILIZED AREAS: ONCE EVERY 30 DAYS <br />D. FROZEN GROUND: AS 500N AS RUNOFF OCCURS OR PRIOR TO RESUMING <br />CONSTRUCTION. <br />17. OWNER MUST KEEP RECORDS OF ALL PERMITS REWIRED FOR THE PROJECT, ALL <br />INSPECTIONS AND MAINTENANCE. PERMANENT OPERATION AND MAINTENANCE AGREEMENTS. <br />AND REOURED CALCULATIONS FOR TEMPORARY AND PERMANENT STORM WATER <br />MANAGEMENT SYSTEMS. THESE RECORDS MUST BE RETAINED FOR THREE YEARS <br />18. SWPPP MUST BE AMENDED WHEN: <br />A. THERE 15 A CHANGE IN DESIGN. OPERATION, MAINTENANCE. WEATHER OR SEASONAL <br />CONDITIONS THAT HAS A SIGNIFICANT EFFECT ON DISCHARGE <br />B. INSPECTIONS INDICATE THAT THE SWPPP 15 NOT EFFECTIVE AND DISCHARGE 15 <br />EXCEEDING WATER OUALIT1 STANDARDS. <br />C. THE BMF'S IN THE SWP99 ARE NOT CONTROLLING POLLUTANTS IN DISCHARGES OR IS <br />NOT CONSISTENT WITH THE TERMS AND CONDITIONS O THE PERMIT. <br />SILT FENCE REOU)RED MAINTENANCE: <br />I. WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF <br />SILT FENCE IT MUST BE REMOVED WITHIN 24 HOURS. <br />2. REPAIR OR REPLACE DISFUNCTIONAL 5111 FENCE <br />WITHIN 24 HOURS. <br />IHSIRES <br />�.i <br />fed <br />CIVIL LEGEND PROPOSED <br />PORN OPPOSE <br />COMAS <br />I,.oRAN, • <br />P4 WI[¢ALVE <br />PP. P051 MCAT* YN.RE <br />❑ WO POLE <br />(5 POWER POLE • <br />9d <- <br />11- SOIL BORINGS <br />• PATER APAHElE <br />5 7EEEPPOK OAm1at <br />• Mr( M8MRE <br />52 MEMO 941101E <br />WATER SERVICE <br />WNW. SEANCE <br />HANDICAP NAMING <br />ONESnw M now <br />SNP EELEVA,ON <br />CONTOURS <br />• <br />0 <br />a <br />M <br />• <br />•ry <br />SH n <br />Rs. op Re es <br />NORTH <br />0 30 60 <br />71.J7.-J <br />SCALE IN FEET <br />OCT <br />0 7 2004 <br />SEE SHEET C8 -I FOR GRADING, DRAINAGE, AND EROSION CONTROL DETAILS <br />1 11010CI Name: <br />VAUGHAN <br />ADDITION <br />Minnesota <br />I Owner /Developer Name: <br />MIKE VAUGHAN <br />• <br />600 Birch Street <br />Lino Lakes, Minnesota <br />1 Professional Services: <br />LOUCKS <br />ASSOCIATES <br />Planning • Civil Engale 441 • Land Moseying <br />landscape NChilenln •Envi9nno9A1 <br />7200 114441 law -Sage NW <br />MinnwPIil. 6{111.0x6* 55564 <br />TI phonc17A0424.5505 <br />Fm.- 1763424 -5522 <br />xwwJOHkmm.,Rarum <br />.5.2WP.1 <br />LADD NPR Snasepnis of w rm c ooNN <br />IN as Maly Nan wow o hNnp mi... N. mea•nPO.moaRN E <br />.wnwsN'pa <br />mrauor+r ofew <br />Ps la* el us pg,INHowNANNERH @Rooms <br />oo,aaMaM mmambwa mow mmmmm• <br />Cl -tsix9 <br />1 Submittal: <br />Prokssiola1 Signature: <br />Ih*tlyP 1.y RML.P...OPP 1*914,7.10 <br />famed M 1.m n San my ARIA som•'m• 6I,E OM <br />I Pm•d6y LwP6 RON WEno*,.M•r OP Ha <br />P.O.* MMmARMP <br />1464y A. 9Niwl- I'L <br />141.24 <br />Lkenm No. <br />DAR <br />I Quality COnN01: <br />(ID <br />1 Sheet Index: <br />001 [OVERSHOT <br />CI.1 IX9SIINGLT)NAINA514 A>; <br />C2 -I LTE RAN <br />0.4 GRAIlKN40RMYAGF.AFWXI(A fl WlilX <br />C12 STORM want HALUTIINPREISSIIINPLA\ <br />76-1 PIIILMNNARY <br />0.1 (62014406 0/641511455 <br />C9.1 MORT DEMO <br />11 -1 TREEPOLS(RVATKNRAN <br />I Sh6•L4 Title: <br />( <br />STORM WATER POLLUTION <br />PREVENTION PLAN <br />1 Project No.: <br />04002 <br />Sheet No.: <br />C3-2 <br />