Laserfiche WebLink
• <br />r <br />L <br />GENERAL NOTES <br />1. LANDSCAPE CONTRACTOR TO VERIFY ALL UTILITY LOCATIONS ON PROPERTY WITH THE <br />GENERAL CONTRACTOR AND BY CALLING GOPHER STATE ONE CALL (651- 454 -0002) PRIOR <br />STAKING PLANT LOCATIONS. <br />2. COORDINATE THE PHASES OF CONSTRUCTION AND PLANTING INSTALLATIONS WITH OTHER <br />CONTRACTORS WORKING ON SITE. <br />3. WHERE EXISTING TREES AND /OR SIGNIFICANT SHRUB MASSINGS ARE FOUND ON SITE, <br />WHETHER SHOWN ON THE DRAWING OR NOT, THEY SHALL BE PROTECTED AND SAVED <br />UNLESS NOTED TO BE REMOVED AND /OR ARE IN AN AREA TO BE GRADED, ANY QUESTION <br />REGARDING WHETHER PLANT MATERIAL SHOULD REMAIN OR NOT SHALL BE BROUGHT TO <br />THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO REMOVAL <br />4. ALL EXISTING TREES TO REMAIN TO BE rtNIIUZED AND PRUNED TO REMOVE DEAD WOOD <br />AND DAMAGED OR RUBBING BRANCHES. <br />5. BB TREES AND SHRUBS ARE BALLED AND BURLAPED. <br />6. NO PLANT MATERIAL SUBSTITUTIONS WILL BE ACCEPTED UNLESS APPROVAL IS REQUESTED <br />OF THE LANDSCAPE ARCHITECT BY THE LANDSCAPE CONTRACTOR PRIOR TO THE <br />SUBMISSION OF A BID AND /OR QUOTATION. <br />7. ALL PLANT MATERIAL SHALL COMPLY WITH THE LATEST EDITION OF THE AMERICAN <br />STANDARD FOR NURSERY STOCK, AMERICAN ASSOCIATION OF NURSERYMEN. <br />6. CONTRACTOR I5 RESPONSIBLE FOR ON -GOING MAINTENANCE OF ALL NEWLY INSTALLED <br />MATERIALS UNTIL TIME OF OWNER ACCEPTANCE. ANY ACTS OF VANDALISM OR DAMAGE <br />WHICH MAY OCCUR PRIOR TO OWNER ACCEPTANCE SHALL BE THE RESPONSIBILITY OF THE <br />CONTRACTOR. <br />9. CONTRACTOR SHALL PROVIDE A WRITTEN REQUEST FOR THE OWNER ACCEPTANCE <br />INSPECTION. <br />10. WARRANTY FOR LANDSCAPE MATERIALS SHALL BEGIN ON THE DATE OF ACCEPTANCE BY THE <br />LANDSCAPE ARCHITECT AFTER THE COMPLETION OF PLANTING OF ALL LANDSCAPE <br />MATERIALS. NO PARTIAL ACCEPTANCE WILL BE CONSIDERED. <br />11. CONTRACTOR SHALL GUARANTEE NEW PLANT MATERIAL THROUGH ONE CALENDAR YEAR <br />FROM THE DATE OF OWNER ACCEPTANCE WITH ALL REPLACEMENTS TO BE PROVIDED AT NO <br />ADDITIONAL COST TO THE OWNER. <br />MI DECIDUOUS TREE <br />VAF <br />24" <br />IES <br />M <br />IIIIII <br />II- <br />TO <br />-B' -0" <br />STEEL STAKE <br />12" <br />11111123= �reicr�� �/i =11111 <br />I1I =11.. <br />_111111E:11M <br />In°uinr -w... -.� ° °- III„ IIIIII <br />NOTE <br />TWO ALTERNATE METHODS OF <br />TREE STAKING ARE ILLUSTRATED <br />IT I5 THE CONTRACTOR'S OPTION <br />TO STAKE TREES; HOWEVER. THE <br />CONTRACTOR IS RESPONSIBLE FOR <br />MAINTAINING TREES IN A PLUMB <br />POSITION THROUGHOUT THE <br />GUARANTEE PERIOD. <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE EPRIOR <br />7 TO PLANTING <br />ABOVE FINISHED GRADE lT OR JUST <br />DOUBLE STRAND 14 GA. WIRE - <br />3' 0 120' INTERVALS (TYP.) <br />16' POLYPROPYLENE OR <br />POLYETHYLENE (40 MIL 1 -1/2" <br />WIDE STRAP TYP.) <br />TREE WRAP TO FIRST BRANCH <br />FLAGGING - ONE PER WIRE <br />ROOTBALL TO SR ON SUBGRADE <br />MULCH - " DEEP SHREDDED BARK <br />(UNLESS NOTED OTHERWISE) <br />PLANTING SOIL - SEE SPEC. <br />TOPSOIL <br />SUBGRADE <br />2' X 2" X 24' WOOD STAKE SET <br />AT ANGLE <br />SOD <br />NOTE: <br />THE HOLE FOR PLANTING MUST BE AT LEAST <br />TWICE THE WIDTH OF THE ROOT BALL <br />ALL TREES TO BE PLANTED WITH THE ROOT COLLAR <br />LEVEL OR SLIGHTLY ABOVE GRADE. <br />NE PLANTING SPECIFICATIONS <br />1. PLANTING BED PREPARATION: ALL MASS PLANTING BEDS SHALL BE TILLED TO A MINIMUM <br />DEPTH OF 10 ". AMENDMENTS SHALL BE APPUED AFTER CULTIVATION. <br />2. BACKFILL SOIL: USE SOIL EXCAVATED FROM PLANTING HOLES AND PROVIDE AMENDMENTS. <br />REMOVE ALL DEBRIS INCLUDING ROCKS LARGER THAN 3" DIAMETER. <br />3. FERTIUZATION: ALL PLANT MATERIALS SHALL BE FERTILIZED UPON INSTALLATION WITH <br />DRIED BONE MEAL OR OTHER SPECIFIED FERTILIZER MIXED IN WITH THE PLANTING SOIL PER <br />THE MANUFACTURER'S INSTRUCTIONS. UNLESS NOTED OTHERWISE. <br />4. MULCH MATERIAL: AS SPECIFIED ON THE LANDSCAPE PLANS. MASS MULCH ALL PLANTING <br />BEDS TO 3" DEPTH OVER FIBER MAT WEED BARRIER. ALL PERENNIAL PLANTING BEDS TO <br />RECEIVE 3' DEEP SHREDDED HARDWOOD MULCH WITH NO FIBER MAT WEED BARRIER. ALL <br />EVERGREEN AND DECIDUOUS TREES TO RECEIVE 4° DEEP SHREDDED HARDWOOD MULCH <br />WITH NO MULCH IN DIRECT CONTAOT wITu TREE TRUNK. <br />5. TREE STAKING: R SHALL BE THE CONTRACTOR'S RESPONSIBILTY TO STAKE AND /OR GUY <br />THE TREES ACCORDING TO THE DETAILS. R IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE <br />EVERY STEP NECESSARY TO MAINTAIN THE TREES AND SHRUBS IN AN UPRIGHT AND PLUMB <br />CONDITION AT ALL TIMES UNTIL THE END OF THE PLANT GUARANTEE PERIOD ESPECIALLY <br />WHERE VANDALISM, SOIL OR WIND CONDITIONS ARE A PROBLEM. <br />6. TREE WRAPPING: WRAPPING MATERIAL SHALL BE QUALITY, HEAVY WATERPROOF CREPE <br />PAPER MANUFACTURED FOR THIS PURPOSE. WRAP ALL DECIDUOUS TREES PLANTED IN THE <br />FALL PRIOR TO 12 -1 AND REMOVE ALL WRAPPING AFTER 5 -1. <br />7. RODENT PROTECTION: PROVIDE ON ALL TREES, EXCEPT SPRUCE UNLESS OTHERWISE <br />SPECIFIED. <br />B. PLANTING PLAN: ALL PROPOSED PLANTS SHALL BE LOCATED CAREFULLY AS SHOWN ON THE <br />PLANS. PLAN TAKES PRECEDENCE OVER PLANT SCHEDULE IF DISCREPANCIES IN QUANTITIES <br />EXIST. SPECIFICATIONS TAKE PRECEDENCE OVER NOTES. RESPECT STATED DIMENSIONS. <br />DO NOT SCALE DRAWINGS. <br />9. EDGING: EDGING SHALL BE 4' P.V.C. COMMERCIAL GRADE EDGING WITH THREE (3) METAL <br />ANCHOR STAKES PER 20 FOOT SECTION. ALL MASS PLANTING BEDS SHALL HAVE EDGING <br />PLACED BETWEEN MULCH AREA AND ANY ADJACENT TURF AREA. <br />10. ALL PLANT MATERIAL SHALL BE THOROUGHLY WATERED TWICE DURING THE FIRST 24 -HOUR <br />PERIOD AFTER INSTALLATION. ALL PLANTING SHALL BE THEN WATERED WEEKLY, OR MORE IF <br />NECESSARY, DURING THE FIRST GROWING SEASON. <br />IN CONIFEROUS TREE <br />NOTES: <br />CONIFER TO HAVE SHREDDED HARDWOOD MULCH UNLESS NOTED OTHERWISE <br />NO MULCH TO BE IN CONTACT WITH TRUNK. <br />SCARIFY BOTTOM AND SIDES OF HOLE PRIOR TO PLANTING. <br />TWO ALTERNATE METHODS OF TREE STAKING ARE ILLUSTRATED. <br />IT IS INC CONTRACTOR'S OPTION TO STAKE TREES; HOWEVER, THE CONTRACTOR I5 <br />RESPONSIBLE FOR MAINTAINING TREES IN A PLUMB POSITION THROUGHOUT THE <br />GUARANTEE PERIOD. <br />PLACE ROOT COLLAR AT OR JUST ABOVE FINISHED GRADE <br />HIES <br />-111111= <br />NOTE: <br />THE HOLE FOR PLANTING MUST BE AT LEAST <br />TWICE THE WIDTH OF THE ROOT BALL <br />ALL TREES TO BE PLANTED WITH THE ROOT COLLAR <br />LEVEL OR SLIGHTLY ABOVE GRADE. <br />MN PLANTING NOTES <br />1. NO PLANTING TO BE INSTALLED UNTIL GRADING AND CONSTRUCTION HAS BEEN COMPLETED <br />IN THE IMMEDIATE AREA. <br />2. ALL PLANT MATERIAL LOCATIONS MUST BE REVIEWED AND APPROVED BY THE LANDSCAPE <br />ARCHITECT PRIOR TO ANY AND ALL DIGGING. <br />3. IF THE LANDSCAPE CONTRACTOR PERCEIVES ANY DEFICIENCIES IN THE PLANT SELECTIONS, <br />SOIL CONDITIONS, OR ANY OTHER SITE CONDITION WHICH MIGHT NEGATIVELY AFFECT <br />PLANT MATERIAL ESTABLISHMENT, SURVIVAL, OR GUARANTEE, THEY SHALL BRING THESE <br />DEFICIENCIES TO THE ATTENTION OF THE LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. <br />4. ADJUSTMENTS IN LOCATION OF PROPOSED PLANT MATERIALS MAY BE NEEDED IN FIELD. <br />SHOULD AN ADJUSTMENT BE ADVISED, THE LANDSCAPE ARCHITECT MUST BE NOTIFIED. <br />5. ALL PLANTS TO BE INSTALLED AS PER PLANTING DETAILS. <br />6. ONE SHRUB PER TYPE AND SIZE IN EACH PLANTING BED AND EVERY TREE SHALL BE CLEARLY <br />IDENTIFIED (COMMON OR LATIN NOMENCLATURE) WITH A PLASTIC TAG WHICH SHALL NOT BE <br />REMOVED PRIOR TO OWNER ACCEPTANCE. <br />7. WHERE SOD /SEED ABUTS PAVED SURFACES, FINISHED GRADE OF SOD /SEED SHALL BE HELD <br />1' BELOW SURFACE ELEVATION OF TRAIL, SLAB, CURB, ETC. <br />B. SOD SHALL BE LAID PARALLEL TO THE CONTOURS AND SHALL HAVE STAGGERED JOINTS. ON <br />SLOPES STEEPER THAN 3:1 OR IN DRAINAGE SWALES, THE SOD SHALL BE STAKED TO THE <br />GROUND. <br />9. SEED ALL AREAS DISTURBED DUE TO GRADING OTHER THAN THOSE AREAS NOTED TO <br />RECEIVE SOD. <br />10. REPAIR ALL DAMAGE TO PROPERTY FROM PLANTING OPERATIONS AT NO COST TO THE <br />OWNER. <br />MI IRRIGATION NOTES <br />1. LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A SHOP DRAWING <br />ILLUSTRATING AN IRRIGATION PLAN AND SPECIFICATION AS PART OF THE SCOPE OF WORK <br />WHEN BIDDING. THESE SHALL BE REVIEWED BY THE OWNER PRIOR TO ORDERING. <br />2. VERIFY EXISTING /PROPOSED IRRIGATION SYSTEM LOCATION. <br />3. UNLESS OTHERWISE NOTED ALL SOD AND PLANTING AREAS INDICATED ON PLAN SHALL <br />BE 1005 IRRIGATED. THE IRRIGATION SHALL INCLUDE THE PUBLIC RIGHT OF WAY BETWEEN <br />PROPERTY UNE AND BACK OF CURB WHERE NEW LANDSCAPE IMPROVEMENTS ARE <br />PROPOSED. <br />4. IT SHALL BE THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO INSURE THAT ALL <br />50D AND PROPOSED LANDSCAPE PLANTINGS ARE IRRIGATED PROPERLY, INCLUDING THOSE AREAS <br />DIRECTLY AROUND AND ABUTTING BUILDING FOUNDATION. <br />5. THE LANDSCAPE CONTRACTOR SHALL PROVIDE THE OWNER WITH A WATERING /LAWN <br />IRRIGATION SCHEDULE APPROPRIATE TO THE PROJECT SITE CONDITIONS AND TO PLANT <br />MATERIAL GROWTH REQUIREMENTS. <br />6. AREAS THAT ARE SEED SHALL NOT BE IRRIGATED <br />= SHRUB <br />DOUBLE STRAND 14 GA WIRE, <br />3' 0 120' INTERVALS (TYP.) <br />16' POLYPROPYLENE OR <br />POLYETHYLENE (40 MIL, <br />1-1/2" WIDE STRAP "TYP.) <br />B' 0' STEEL STAKE <br />FLAGGING - ONE PER WIRE <br />ROOTBALL TO SR ON <br />SUBGRADE <br />MULCH - 4" DEEP <br />SHREDDED BARK (UNLESS NOTED OTHERWISE) <br />PLANTING SOIL - SEE SPEC. <br />TOPSOIL <br />SUBGRADE <br />2' X 2" X 24' WOOD STAKE <br />SET AT ANGLE <br />SOD <br />15' MIN. <br />,f4:::- <br />'`\,� <br />-a*. ��, <br />- '9111 -1iIL IIli1= <br />tam -umr <br />111111= 11ih.. ��o inn nun <br />111111 = 111111111111- 111111 - 111111- 111111M1111111- <br />NOTE <br />HAND LOOSEN ROOTS OF <br />CONTAINERIZED MATERIAL (TYP.) <br />SCARIFY BOTTOM AND SIDES OF <br />HOLE PRIOR TO PLANTING H <br />ABOVE FINIISHE CCD LGt p ET OR JUST <br />SHRUBS TO SR ON SUBGRADE <br />MULCH - 3° DEEP SHREDDED BARK <br />(UNLESS NOTED OTHERWISE) <br />LANDSCAPE FABRIC - SEE SPEC. <br />PLANTING SOIL - SEE SPEC <br />4" P.V.C. EDGING <br />REFER TO PLAN FOR GROUND <br />COVER <br />SUBGRADE <br />CENTERING OF SHRUB IN BED <br />TO TAKE PRECEDENCE OVER <br />DIMENSION FROM EDGE. <br />NOTE: <br />THE HOLE FOR PLANTING MUST BE AT LEAST <br />TWICE THE WIDTH OF THE ROOT BALL <br />ALL SHRUBS TO BE PLANTED WITH THE ROOT COLLAR <br />LEVEL OR SLIGHTLY ABOVE GRADE. <br />WARNING; <br />THE CONTRACTOR SHALL CONTACT <br />ALL PUEUC UOLBIES FOR LOCATIONS <br />OF ALL UNDERGROUND WIRES, CABLES. <br />CONDORS, PIPES, MANHOLES, VALVES, <br />OR OMER BURIED STRUCTURES BEFORE <br />DIGGING. HE SHALL REPAIR 00 REPLACE <br />THE ABOVE WHEN DAMAGED DURING <br />BUILDING LASTING RELATIONSHIPS <br />RYAN COMPANIES US, INC. <br />50 South Tenth Street, Suite 300 <br />Minneapolis, MN 55403 -2012 <br />612492400D tel <br />612 - 4923000 fax <br />WW W.RYANCOMPANIES.COM <br />PROJECT NAME <br />LINO LAKES <br />MARKETPLACE <br />THIRD ADDITION <br />LOCATION <br />LINO LAKES <br />MINNESOTA <br />SHEET TITLE <br />LANDSCAPE PLAN <br />REVISIONS <br />411.2005 PREUMINARY SITE PLAN <br />1 hereby comfy dtar this plan, specification, <br />or reporr was prepared by me or under my <br />direct supervision and that I am a duly <br />Licensed Landscape Arcb orcr under the <br />laws of the Stare of Minnesova. <br />PETER W. MC ENERY <br />REGISTRATION NO. DATE <br />42932 4111105 <br />IP MIS RYAN COMPANIES us. INC. <br />JOB NUMBER HISTORY <br />SHEET NUMBER <br />L2.1 <br />DRAWNBY <br />HMM <br />JOB NUMBER <br />CHECKED BY <br />PWM <br />DATE <br />4/1112005 <br />7 <br />• <br />