Laserfiche WebLink
City Council <br />April 14, 2003 <br />DQ Grill & Chill Site Plan Review & CUP <br />Lighting <br />Lighting fixtures are shoebox style with downcast lighting, in conformance to City <br />standards and similar to fixtures within the rest of the Market Place complex. The <br />lighting plan meets with the approval of the CPTED review. <br />The Market Place PDO requires that any building- mounted accent lighting should <br />conform to standards noted in the PDO. Accent lighting is proposed for the <br />building and staff are working with the applicant to insure that minimal direct or <br />sky- reflected glare results. <br />Signage <br />Signage is govemed by the City's sign ordinance and permits are required for all <br />signs. All signs will be reviewed with the sign permit applications. <br />The Lino Lakes Market Place PDO, Section 2.C.1.d, states that wall signage for <br />single tenant buildings within the Lino Lakes Market Place complex "shall be <br />designed in accordance with the sign requirements of the Shopping Center (SC) <br />Zoning District as specified in Ordinance No. 12 -97" (Lino Lakes Sign <br />Ordinance). <br />According to the Lino Lakes Sign Ordinance, wall signage in the SC District is <br />limited to one wall sign, which is limited in size to 100 sq.ft. or 20% of the building <br />face, whichever is less. <br />The Market Place PDO, provides for one monument sign on the site in <br />accordance with the approved design standards. <br />Trash <br />Trash equipment will be confined to a fully enclosed structure, which will be <br />constructed of brick to match the principle building and located at the southeast <br />comer of the site. <br />Utilities <br />A utility plan has been submitted for review by the City Engineer. Water and <br />Sanitary sewer service were provided to service the site as part of the Market <br />Place development. As a condition of plan approval, the utility related <br />modifications and comments, as set forth in the City Engineer's memo, should to <br />be incorporated into the final plans.. <br />Stormwater management <br />A grading and drainage plan has been submitted for review by the City Engineer. <br />As a condition of plan approval, the grading and drainage related modifications <br />6 <br />