. " Dairy Queen Chill and Grill Page 2 March 6, 2003 <br />City of Lino Lakes, Minnesota <br />hours, etc.), this may create congestion and safety concerns. It is recommended that the Owner address this <br />issue further. In addition, it is recommended that the drive- through exit be extended slightly further south <br />(eliminating one parking space), to route exiting traffic through the parking lot more uniformly: <br />Comments - Drainage Review and Calculations <br />Hydro -Cad calculations have been reviewed and accepted. The proposed site is included within the greater <br />area of the Lino Lakes Market Place Master Plan, which was previously reviewed and approved by the Rice <br />Creek Watershed District. The proposed Dairy Queen Chill and Grill site generally meets the concept design <br />presented in the permit previously approved. <br />Grading, Drainage, and Erosion Control <br />1. The site area is approximately 1 acre in size. Although the site area has already been approved by <br />Rice Creek Watershed District, erosion control measures will be required, and are addressed on the <br />plans. <br />2. Under note 7, the Contractor shall provide a sweeper to clean streets and paved areas outside of the <br />project site on a daily basis as needed. . <br />3. The Contractor shall confine all work activity, including storage of equipment and materials, to the <br />site area itself. The Contractor's activity shall not impede or impact traffic access for other <br />businesses and through traffic in the immediate area. All adjacent streets and access drives shall be <br />kept clear at all times. <br />Utilities <br />1. The proposed site improvements will be connected to either in place utilities or utilities constructed <br />as part of the overall Lino Lakes Marketplace Plan. The Chill and Grill utility plan shows a <br />combination of existing and proposed sanitary sewer, storm sewer, and waterfacilities. These <br />utilities are not clearly defined as to which are existing and proposed, and whose responsibility it is to <br />construct them. It does appear that all necessary supporting existing infrastructure has been <br />constructed and is in place. . <br />2. A note must be added that the City of Lino Lakes Utility Supt. Shall be contacted at least 48 hours <br />prior to any utility work, utility connections, or any work in the public right of way performed. <br />3. A note must be added that all sanitary sewer and water main installed as part of this project shall be <br />installed; tested and accepted per the requirements of the City of Lino Lakes, Specifications of the <br />City Engineers Association of Minnesota, the MinnesotaDepartment of Health, and the Minnesota <br />Pollution Control Agency as required. Sanitary Sewer service pipe shall be SDR 26 or SCH 40 and <br />ductile iron water.pipe shall be CL 52. Gate Valves shall be Mueller A- 2370 -20 with mechanical <br />joints, meeting AWWA Specifications C500 -61. Valve Boxes shall be Mueller H -10357 with H- <br />10361 drop lid and extensions shall be Mueller H- 10363. <br />