Laserfiche WebLink
NOT IN CONTRACT <br />(N.I.C.) <br />NOT IN CONTRACT <br />(N.I.C.) <br />NOT IN CONTRACT <br />(70.1.5.) <br />DRIVE-THRU <br />NOT IN CONTRACT <br />(N.I.C.) <br />4- LANDSCAPING NOTES: —00- <br />1. AREAS DISTURBED BY CONSTRUCTION ACTIVI1ES SHALL <br />RECEIVE 4' LAYER LOAM AND WASHED SOD AS SPECIFIED <br />UNLESS OTHERWISE NOTED ON THE DRAWINGS. AREAS <br />MINN STREET RIGHT -OF -WAY SHALL RECEIVE LOAM AND <br />SOD WITHIN 72 HOURS OF FINAL GRADING. SEE SOD <br />INSTALLATION NOTES BELOW. <br />2. LOCATIONS OF DECIDUOUS AND CONIFEROUS TREES ARE <br />APPROXIMATE AND SHALL BE COORDINATED WITH <br />UNDERGROUND AND OVERHEAD UT01100. UGHTNG <br />FIXTURES, DOORS AND WINDOWS, AND STAKED IN THE <br />FIELD PRIOR TO INSTALLATION FOR REVIEW AND APPROVAL <br />BT THE LANDSCAPE ARCHITECT. <br />3. TREES AND SHRUBS SHALL BE BALLED AND <br />BIODEGRADABLE BURLAP. <br />4. PLANTING BEDS SHALL RECEIVE 4' LAYER DF 1 -1/2' <br />DRAT ANGULAR TRAP STONE MULCH ON TOP OF A <br />NON - BIODEGRADABLE FILTER FABRIC AND BORDERED WITH <br />3/16' 11410( STEEL OR ALUMINUM EDGING. <br />5. RAINGARDEN AND INFILTRATION BASINS SHALL RECEIVE <br />ECS SYSTEMS AND NETLAWN ADVANCED 11RF AS <br />060001ED. <br />B. ENTIRE STE SHALL BE FULLY IRRIGATED. THE <br />CONTRACTOR SHALL SUBMIT IRRIGATION SHOP DRAWINGS <br />FOR REVIEW AND APPROVAL BY 114E LANDSCAPE <br />ARCHITECT PRIOR 10 INSTALLATION. <br />&-PAVEMENT VARIES <br />SEE DRAWINGS <br />' 7fRib <br />' f'1. P E ZT€ <br />(-PAVEMENT VARIES <br />SEE DRAWINGS <br />■ <br />�� IJMIT CF CONSiRUCTON <br />THREE TIES WIDTH <br />OF ROC/MALL <br />DECIDUOUS TREE PLANTING <br />DETAIL <br />NOT TO SCALE <br />e <br />PRUNE AS FIELD DIRECTED BY THE <br />LANDSCAPE ARCHITECT TO IMPROVE <br />APPEARANCE (RETAIN NORMAL <br />TREE SHAPE) <br />THREE 2'04'X8' WOODEN STAKES. STAINED BROWN <br />WITH 1W0 STRANDS OF WIRE TWISTED TOGETHER. <br />STAKES SHALL BE PLACED AT 120' TO ONE <br />ANOTHER. WIRE SHALL BE THREADED THROUGH <br />BLACK RUBBER HOSE COLLARS <br />TRUNK RARE JUNCTION: <br />PLANT TREE 1' -2' ABOVE <br />EXISTING GRADE <br />1 -1/2" TRAP STONE MULCH TO <br />OUTER EDGE OF SAUCER. KEEP <br />MULCH 2' FROM TRUNK <br />EXISTING GRADE <br />CUT AND REMOVE BURLAP FROM TOP <br />1/3 OF ROOT BALL IF <br />NON - BIODEGRADABLE, REMOVE <br />COMPLETELY <br />SLOPE 5106 OF HOLE <br />BACKFILL AS SPECIFIED <br />00 NOT EXCAVATE <br />BELOW 800106IL <br />NINO <br />PRUNE AS FIELD DIRECTED BY THE <br />LANDSCAPE ARCNTECT TO IMPROVE <br />APPEARANCE (RETAIN NORMAL TREE <br />SHAPE) <br />THREE 2"%4"X8' WOODEN STAKES. SINNED <br />BROWN WITH TWO STRANDS OF WIRE TWISTED <br />TOGETHER. STAKES SHALL BE PLACED AT 12P <br />11) ONE ANOTHER WIRE SHALL BE THREADED <br />THROUGH BLACK RUBBER HOSE COLLARS <br />TRUNK FLARE JUNCTION: <br />PLANT TREE 1 - -2' ABOVE COSTING GRADE <br />1-1/2" TRAP STONE MULCH TO <br />OLTTM EDGE OF SAUCER KEEP <br />MULCH 2" FROM TRUNK <br />EXISTING GRADE <br />CUT AND REMOVE BURLAP FROM TOP 1/3 <br />OF ROOT BALL IF NON- BIODEGRADABLE. <br />REMOVE COMPLETELY <br />SLOPE SIDES OF HOLE <br />BACKFILL AS SPECIFIED <br />D0 NOT EXCAVATE BELOW ROOTBALL <br />THREE TIMES NI070 <br />OF ROOTBALL <br />EVERGREEN TREE PLANTING <br />DETAIL <br />NOT TO SCALE <br />0 <br />TREES 0Y— ' <br />GRATES <br />- -0THEiS (TYP.) <br />THREE TIMES WIDTH <br />OF ROOTBALL <br />SHRUB PLANTING <br />DETAIL <br />NOT TO SCALE <br />0 <br />:/'10 0 20 <br />4)-- PLANTING SCHEDULE —ID-- <br />OTY. COMMON NAME <br />SODDING INSTALLATION: —9- <br />1. THE LOAM AND SOIL SHALL BE C LATER MINIMUM, <br />LOOSENED, AND FREE OF CLODS, ROCKS AND DEBRIS. <br />2. AREAS TO RECEIVE SOD SHALL BE FERTILIZED WITH 25 <br />POUNDS PER 1000 00.01. (1000 LB /AC) OF 10 -10-15 <br />FERTUZER AND WORKED INTO THE TOPSOIL <br />3. TOPSOIL SHALL BE DAMPENED PRIOR TO LAI NG THE <br />500. JOINTS IN 11)0 SOD SHALL BE STAGGERED. AND THE <br />EDGES BUTTED TOGETHER TIGHTLY TO AVOID GAPS <br />BETWEEN SOD LENGTHS. <br />4. S00 INSTAUET ON SLOPES 3:1 OR GREATER, OR IN <br />AREAS OF CONCENTRATED FLOWS. SHALL BE STAKED IN <br />PLACE INSTALL THE SOD WITH THE LENGTH <br />PERPENDICULAR TO THE WATER FLOW FOR SLOPES WiT1 <br />SHEET FLOW. <br />5. AFTER INSTALLATION, AREAS SHALL BE TAMPED OR <br />ROLLED TO PROVIDE GOOD CONTACT BETWEEN SOD AND <br />SQL AFTER ROVING, THE SOD SHOULD BE WATERED SO <br />THAT THE SOIL S MOISTENED 4 INCHES BELOW THE 500. <br />— SODDING MAINTENANCE: —4)- <br />1. IN THE ABSENCE OF ADEQUATE RAINFALL WATER <br />DURING THE 30 DAY PERIOD FOLLOWING SOD PLACEMENT <br />TO KEEP SOIL MOIST. FOLLOWING THIS INITIAL 30 DAY <br />ESTABUSHMENT PERIOD, WATER AS NECESSARY TO <br />MAINTAIN ADEQUATE MOISTURE I1 TIE ROOT ZONE. <br />2. WHERE M011I140 I0 DESREO, MAINTAIN GRASS HEIGHT OF <br />3 INCHES AND SHOULD NOT BE ATTEMPTED UNTIL THE 500 <br />IS FIRMLY ROOTED, USUALLY TWO TO THREE REEKS AFTER <br />SOD IS LAID. <br />3. INSPECT AREAS OF CONCENTRATED FLOW ANNUALLY <br />AND FOLLOWING INTENSE STORMS. MAKE NEEDED REPAIR <br />AND REVEGETATE PROMPTLY. <br />- — SEEDING RECOMMENDATIONS: -0- <br />1. SEED MIXTURE SHALL BE MNDOT 60B AND INSTALLED NO <br />LATER THAN JUNE 151H. IF PLANTING OCCURS AFTER <br />AUGUST 1510, SEED 111111 A NURSE CROP OF RTE NO <br />LATER THAN OCTOBER 5114. IF PLANTING HAS NOT <br />OCCURRED BY OCTOBER 51H. THEN DORMANT SEED THE <br />SITE NO LATER THAN NOVEMBER 1ST. <br />PAVER EDGE <br />111 -t=' II V B 10 (' II L 11 It -11 IF-.1 1 i - � <br />