My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/31/2005 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2005
>
08/31/2005 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2014 11:26:02 AM
Creation date
8/5/2014 11:15:01 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
08/31/2005
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agenda Item 5E <br />Environmental Board Meeting Date: August 31, 2005 <br />Topic: Legacy Hotel Project <br />Background: . This is final plat information. Surface Water issues and general <br />landscape issues have previously been brought to the Board. <br />Analysis: <br />Landscape (Attachment 2) <br />Plant Schedule: Recommend the following changes based on the Plant <br />Schedule - -- Crimson King maple is a Norway maple and of borderline hardiness. <br />Norway maples are also listed by the Minnesota Department of Natural <br />Resources as invasive to our native woodlands. I would suggest changing this <br />species to one of the following -- Northern Pin Oak, Red Oak, Bur Oak, Autumn <br />Blaze Maple, Hackberry, American Linden, Green Ash. Change Greenspire <br />Linden to Redmond Linden (a cultivar of the American Linden). Change <br />Colorado Blue Spruce to White or Norway Spruce. <br />If salt spray is a concern along the freeway (usually within 60 feet), Black Hills <br />Spruce and Ginkgo may be more tolerant, than eastern Red Cedar and Linden. <br />Sod areas must be shown as irrigated. All top soils should be described as <br />incorporated into the sub soil for several inches. <br />Lighting Plan (Attachment 3) <br />The Lighting and Photometric plan is included as Attachment 3 for your review. <br />Erosion Control <br />The developer should submit an erosion control plan that details NPDES <br />requirements and is acceptable to the City. The plan and inspections reports for <br />this plan must be located on site with an indicated location on the plan. <br />Options: <br />1. Recommend approval <br />2. Other recommendation <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.