Laserfiche WebLink
9C <br />8 <br />3 <br />8 <br />FOUNDATION PLANTING SCHEDULE <br />SYM <br />KEY <br />COMMON NAME <br />BOTANICAL NAME <br />SIZE <br />QTY. <br />NOTES <br />SL <br />'Slowmound' Muqho Pine <br />Pinus mugo'Slowmound' <br />#3 cont. <br />3 <br />— <br />DW <br />Dwarf Winged Euonvmus <br />Euonymus alatus'Compactus' <br />#5 Cont. <br />1 <br />— <br />! <br />GS <br />'Goldflame' Spirea <br />Spiraea x bumalda'Goldflame' <br />#2 Cont. <br />11 <br />Plant 4.5' on center <br />* <br />MK <br />'Miss Kim' Lilac <br />Syrinaa patula 'Miss Kim' <br />#5 cont. <br />6 <br />Plant 6' on center <br />VB <br />Compact American Viburnum <br />Viburnum trilobum 'Bailey Compact' <br />#5 cont. <br />7 <br />Plant 8' on center <br />AM <br />Compa'`t Ai tur Maple <br />Acer qinnala 'Compactum' <br />#7 Cont. <br />3 <br />Plant 8' on center <br />KF <br />'Kart Foerster Calamaqrostis <br />Calamaqrostis x acutifora 'K. F.' <br />1 qal. <br />9 <br />Plant 3' on center <br />• <br />RG <br />'Goldsturm' Rudbeckia <br />Rudbeckia 'Goldsturm' <br />1 qal. <br />15 <br />Plant 2' on center <br />TOTAL SHRUBS <br />31 <br />TOTAL PERENNIALS <br />24 <br />' <br />\/ <br />/ <br />• <br />\\Y isl • <br />" :SiFb• <br />COI <br />• <br />• <br />• • <br />- Ts <br />•s— <br />�s aP • e e <br />eineallaWielleallearetelfrale <br />• <br />• <br />. <br />" <br />d" <br />• N <br />`• O6 <br />N. 1/ <br />I \ <br />V / /I <br />TY■m b.ue P•nry DN. <br />Typed Dneuws tin Rove Dmf <br />reollirf YM[ <br />PLANTING NOTES: <br />Contractor shall provide a one year guarantee on all plant materials. The <br />guarantee begins on the date of the Landscape Architect's written acceptance of <br />the initial planbng. Replacement plant materials shall also have a one year <br />guarantee commencing upon planting. <br />All plants are to be northern grown and hardy. <br />Planes to be Installed as per standard AAN planting practices. <br />Use pulver red topsoil for backfill material in bee planting holes and shrub beds, <br />see planting details for depths. Use a sail mix o11 -1 -1 (puNenzed topsoil. sand, <br />peat moss) for perennial and annual beds, installed at a minimum depth of 1T. <br />Contractor shall verify locations with as utilities poor to Installation of plants. <br />All sod areas shall be irngated with an automated underground sprinkler system <br />AB landscaped areas shall be irrigated cosh either spray heads or with leaky pipe'. <br />Staking of bees i5 optional: reposalon if not plumb after one year. <br />Wrap el smooth - barked trees and fasten at top and bottom. Remove by Aptl11. <br />Open top of burlap on 6a materials. remove pot on potted plants, split and break <br />apart peat pots. <br />Prune plants as necessary per standard nursery practice. <br />The Owner shell be responsible for maintenance after the Owner's acceptance of <br />the wok. <br />Plants shell be Immediately planted upon arrival at site. Properly heel In materiel <br />if necessary (temporary only). <br />Al disturbed areas are to be either sodded or seeded as noted. Sod shall be <br />northern grown and hardy. <br />Planting beds for shrubs shall have 5.5' vertical black pity edging (commerdal <br />grade), weed banter fabric or poly barrier and mulch. The edging shall be placed <br />and staked with smooth curves. See landscape Plan for depth and type of mulch. <br />5hre00ed hardwood mulct shell be provided around all Instated trees el a depth <br />of 4' and a diameter of 3' minimum. <br />tJ <br />%cr <br />LL Gd <br />< tr) <br />Jw - <br />d <br />(1) <br />ON I'D <br />L � <br />0E4200 <br />rmp.CL!! <br />000 <br />C1.3 <br />