Laserfiche WebLink
waters from leaving the site. The plan should also indicate a method to control <br />wind erosion off of the site. The SWPPP must show one, and only one area on <br />the site where cement trucks will clean their tanks. This area must be protected <br />from the movement of cleaned materials from the clean site. The SWPPP must <br />indicate disposal of Cement Truck Cleaning materals after construction is <br />finished. <br />All storm water sewer inlets must be protected with a mechanical device such as the <br />Royal Industries Infra Safe device. <br />Lighting <br />All security lighting that may be installed on the Town Homes must meet City <br />specifications. Trail areas to the east will be lit with the approved roadway decorative <br />lighting fixtures. <br />OPTIONS: <br />1. Approve with Staff and Environmental Board recommendations <br />2. Recommend not to approve <br />RECOMMENDATION: <br />Option 1 <br />Attachments: <br />1. Location Map <br />2. Preliminary Enlargement Plans <br />3. Preliminary Grading and Erosion Control Plan <br />4. Preliminary Landscape Plan <br />5. Preliminary Site Detail C6.1 <br />6. Preliminary Site Detail C6.2 <br />7. Preliminary Site Detail C6.3 <br />