Laserfiche WebLink
Development Contract <br />Stoneybrook <br />lot markers for future property owners. Lot corner irons on the back <br />property line shall be installed so that the top of the iron corresponds to the <br />finished ground elevation in accordance with the approved grading plan - <br />guard stakes shall be appropriately installed to mark these irons. <br />10. The Developer agrees to maintain, at all times before acceptance of the <br />streets by the City, an access road suitable for use by emergency, police and <br />fire department equipment. The adequacy of such road shall be the sole <br />determination of the City. Furthermore, such access road shall be located no <br />more than 150 feet from any structure built within the subdivision. <br />11. The Developer shall promptly clear dirt and debris, within public right -of- <br />ways, and drainage and utility easements, resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) days <br />after notification by the City. The Developer shall be responsible for all <br />necessary street and storm sewer maintenance including street sweeping, <br />storm sewer cleaning, ditch cleaning and pond dredging, resulting from the <br />accumulation of said dirt and debris, until all Certificates of Occupancy <br />are issued. Warning signs shall be placed when hazards develop in streets <br />to prevent the public from traveling on same and directing attention to <br />detours. If and when the streets become impassable, such streets shall be <br />barricaded and closed. The developer shall maintain a smooth, hard driving <br />surface and adequate drainage on all temporary streets. <br />12. Street Lighting: <br />a) Residential street lighting shall be owned by the City. Such street <br />lighting system shall be installed, operated, and maintained by the <br />electric utility company. City and electric utility company may enter <br />into a contractual agreement on the rate and maintenance of the <br />street lighting system. <br />b) It shall be the responsibility of the Developer to pay for street <br />lighting operation charges for the initial 15 months of operation of <br />the system. <br />13. The Developer shall dedicate to the City, prior to approval of the final plat, <br />at no cost to the City, all permanent or temporary easements necessary for <br />the construction and installation of the Developer's Improvements as <br />determined by the City. All such easements required by the City shall be in <br />writing, in recordable form, containing such terms and conditions as the City <br />shall determine. <br />• 14. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, <br />page 5 <br />