Laserfiche WebLink
• <br />12TH AVENUE <br />12TH AVENUE <br />\ <br />V323V 03000M <br />b - <br />LiJ <br />W <br />892_ <br />\ ff <br />\\ o�N <br />\ o <br />\ ,c \ / 1. <br />„Kik <br />04,(4r <br />SILT FENCE(TYP.) 1 <br />_806.4 <br />\v I <br />eD� <br />SB31iI--39A'dds- <br />4 <br />4 <br />Y.. <br />1ST <br />j B 1 4 <br />4 _ -- 884 .. -- -- 884_ -� <br />4 4 <br />"884-`_ <br />4 -..70e4 - \ -L2 <br />� <br />_ X884 <br />_ .GZ 'ON HOL10 /,LNE10� �� . 4 4 --4- <br />-6.96- . -1 r- - ___-_ 1 • <br />- I <br />88 .] 4 L <br />✓ I .B • € O �89p8Re (� ` `SZ ON HOB l` 4 <br />�- )`'Jf I I 4 4 4 ”. <br />_ i° �� e <br />8P / 4 4 4 /' -886 <br />090 r _ r - 1 <br />�� I LI �` — 53'B84�- <br />9— • 4 <br />1 -186= - <br />( _ - - - -- r �'�6� 4 <br />,�i / <br />I i I 4 \0 4 4 1 • N. 4 �> <br />I I T \ 1 I 10 L _Be6� <br />\ 4 I /// ▪ 4 kS 4 <br />�p8 V� /4 4 4, <br />b <br />890- �� - -- - - <br />--B9 <br />baL <br />ACREAGE SUMMARY <br />in ACRES <br />;I I PAVEMENT AREA I 0.00 AC <br />41.1::J.n: ` APIA <br />(? SE005 AREA <br />TOTAL DISTURBED 7.0 AC <br />0 25 AC <br />6.75 AC <br />DEVELOPER /OWNER: <br />ALVIN LAM0TIE <br />6497 12TH AVE S <br />LINO LAKES. MINNESOTA 55014 <br />SHE OPERATOR /CONTRACTOR /GENERAL CONTRACTOR <br />SUPERINTENDENT: <br />SEQUENCE OF CONSTRUCTION <br />PHASE I: <br />1. INSTALL STABILIZED CONSTRUCTION ENTRANCES. <br />2. PREPARE TEMPORARY PARKING AND STORAGE AREA. <br />3. CONSTRUCT 1HE SILT FENCES ON 1HE SITE <br />4. CONSTRUCT THE SEDIMENTA110N AND SEDIMENT TRAP BASINS. <br />5. HALT ALL ACTIVITIES AND CONTACT THE CIVIL ENGINEERING CONSULTANT <br />TO PERFORM INSPECTION CIF BAP. GENERAL CONTRACTOR SHALL <br />SCHEDULE AND CONDUCT STORM WATER PRE - CONSTRUCTION MEETING NTH <br />ENGINEER AND ALL GROUND DISTURBING CONTRACTORS BEFORE <br />PROCEEDING NTH CONSTRUCTION. <br />6 CLEAR AND GRUB 114E 517E <br />7. BEGIN GRADING THE SITE <br />PHASE II: <br />1. 1EMPORARILY SEED DENUDED AREAS <br />2. INSTALL UTILITIES. UNDERDRAINS. STORM SEWERS, CURBS AND GU11000. <br />3. COMPLETE GRADING AND INSTALL PERMANENT 000008G AND PLANING. <br />4 REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES <br />(ONLY IF SITE IS STABILIZED). IF REQUIRED BY THE CONTRACT <br />LEGEND <br />SPOT ELEVATION <br />CONTOUR <br />RIP F:AP <br />CURB & GUTTER _ <br />STORM SLIER •- = <br />SANITARY SEWER O <br />FORC94AIN (SAN.) J <br />WATERMAIN <br />EAMON( <br />OVERFLOW ELEV. <br />RETAINING WALL <br />PROPOSED <br />x 962.5 <br />E7(ISTING <br />A9625 <br />SILT FENCE <br />SOIL BORINGS <br />DIRECTION OF <br />OVERLAND FLOW <br />TEMPORARY <br />DIVERSION DITCH <br />CHECK DAM <br />TEMPORARY STONE <br />CONSTRUCTION ENTRANCE <br />TEMPORARY SEDIMENT BASIN <br />TEMPORARY STORAGE AND PARKING <br />AREA <br />SOIL EROSION /SEDIMENTATION CONTROL OPERATION TIME SCHEDULE <br />NOTE CONTRACTOR OR GENERAL CONTRACTOR TO COMPLETE TABLE WITH THEIR SPECIFIC PROJECT SCHEDULE <br />CONSTRUCTION SEQUENCE <br />JAN <br />FEB <br />MAR <br />APR <br />MAY <br />JUN <br />JUL <br />AUG <br />SEP <br />OCT <br />NOV <br />DEC <br />JAN <br />FEB <br />MAR <br />APR <br />MAY <br />JUN <br />TEMPORARY CONTROL MEASURES <br />STRIP & STOCKPILE TOPSCIL <br />ROUGH GRAD / SEDIMENT CONTROL <br />TEMPORARY CONSTRUCTION ROADS <br />FOUNDATION / BUILDNG CONSTRUCTION <br />SITE CONSTRUCTION <br />PERMANENT CONTROL STRUCTURES <br />FINISH GRADING <br />LANDSCAPING/SEED/FINAL STABILIZATION <br />STORM FACLUTES <br />REFER TO SHEET C.5.03 FOR GENERAL NOTES, <br />MAINTENANCE NOTES, LOCATION MAPS, AND <br />STANDARD DETAILS <br />ST-9 i4A PA -10 <br />AFAR 0 9 2007 yq. <br />0 <br />100 <br />SCALE IN FLLI <br />200 <br />IX <br />W <br />0 <br />NON <br />LL <br />W <br />0 <br />J <br />1 <br />Designed DJD /JMD <br />0 <br />2 O <br />0 <br />m <br />U <br />•L <br />SHEET NU183ER <br />C-5.02 <br />REV. <br />18RA FILE 1 16172 <br />