My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/30/2007 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2007
>
05/30/2007 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2014 2:29:21 PM
Creation date
8/6/2014 12:44:42 PM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
05/30/2007
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />ATTACHMENT 7 <br />MEMORANDUM <br />DATE: May 30, 2007 <br />TO: Jim Studenski <br />FROM: Marty Asleson <br />RE: Grandview SWPPP <br />The following comments should be addressed: <br />1. Must provide maps with : <br />• Existing and final grades <br />• Locations and types of Erosion and sediment control practices <br />• Stormwater flow directions <br />• Soil types, undisturbed areas, wetlands, and receiving waters <br />• Show design and location of Pretreatment and biofiltration basins. <br />2. Change the Type of Slope/Time chart to 14 days vs. 21 days in the "Flatter <br />than 10:1 slope category. <br />3. Change the total site area chart to 4.35 acres vs. 3.29 acres. <br />4. Any vegetation shall be the City Native Seed mix and planted and managed <br />by a DNR listed contractor that is suitable for Native plant installation and <br />maintenance.. This maintenance should include one bum at the end of 3 years. <br />5. Since this is in a shoreland area, a temporary storm pond should be <br />constructed on site to capture construction surface water runoff. <br />6. A concrete washout area should be shown on the map. <br />
The URL can be used to link to this page
Your browser does not support the video tag.