Laserfiche WebLink
• <br />• <br />(c) Name, address and phone number of party responsible for maintenance <br />of all erosion and sediment control measures. <br />(d) Identif+sationClear identification of all temporary erosion and sediment <br />control measures which will remain in place until permanent vegetation is in <br />placeestablished. Examples of temporary measures include, but are not limited <br />to: Seedingseeding with perennial vegetation, mulching, sodding, silt fence, <br />erosion control matting, and hay bale filter barricrsblanketing, and stormwater <br />inlet protection devices. <br />(e) IdentifieatienClear identification of all permanent erosion control <br />measures such as outfall spillways and riprap shoreline protection, and their <br />lecationjocations. <br />(f) For projects over -five- acres -e graded arc, Clear <br />Identification of staging areas, as applicable. <br />(g) Documentation that the project applicant has applied for a National <br />Eliminati <br />Permit from the Minnesota Pollution Control Agency (MPCA), when applicable. <br />(h) A Storm Water Pollution Prevention Plan for projects that require an <br />NPDES Permit, <br />(g) Tabulation . _ .. _ . _ <br />Delineation of any floodplain volume and /or wetland area changes. <br />'' e-•- - - •• ai• I <br />5. CONSTRUCTION ACTIVITY REQUIREMENTS The Permittee must follow the <br />standards of the NPDES permit regarding erosion prevention, sediment contro <br />dewatering, and BMP maintenance for any project requiring a permit by the District. <br />i}. EXCEPTIONS. <br />unit residential -and- tecs than five acres in size for tingle family recidentia� <br />` '�"4st lil-1,000 feet of a <br />(3)- Is- within 300 -f, off Ric Creek, <br />6. INSPECTIONS <br />L) <br />The permittee will routinely inspect project sites as required by the <br />NPDES permit, implementing additional erosion and sediment control <br />measures, as conditions required to assure retention of sediment on site. <br />The permitte- will keep an inspection I• • on site as required by the <br />NPDES permit. <br />tpl The permittee shall be responsible for inspection maintenance and <br />effectiveness of all erosion and sediment control measures until final soil <br />stabilization full completion of the project, or permit assi • I u - I - <br />whichever comes first. (See Rule B for permit assignment requirements.) <br />COI in order to ensure that sediment is retained on -site. the District may <br />inspect the site and require the •ermittee to •rovide additional erosion <br />control measures where site conditions warrant. <br />7. FINAL STABILIZATION <br />W. Erosion and sediment control measures must be maintained until final <br />veae ation and ground cover is established to a density of 70 %, <br />DRAFT DOCUMENT <br />23 <br />