My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08/29/2007 Env Bd Packet
LinoLakes
>
Advisory Boards & Commissions
>
Environmental Board
>
Packets
>
2007
>
08/29/2007 Env Bd Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 12:55:26 PM
Creation date
8/7/2014 10:15:58 AM
Metadata
Fields
Template:
Environmental Board
Env Bd Document Type
Env Bd Packet
Meeting Date
08/29/2007
Env Bd Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT 8-17-07 <br />XIY. FUTURE CAPITAL PROGRAM <br />TABLE 10 <br />Item <br />No. <br />Description <br />Year <br />Cost <br />1 <br />Construction of Well No. 6 and Pumphouse No. 6 with <br />water main <br />2008 - <br />2009 <br />$800,000 <br />2 <br />Strengthen Trunk Watermain (Phase 1) <br />2008 <br />$750,000 <br />3 <br />Construction of a 1.5 MG Ground Storage Tank, <br />Booster Station, and Well No. 7 <br />2010 - <br />2012 <br />$3,000,000 <br />Storage 1.5 million gallons $1,050,000 <br />Booster Station $1,500,000 <br />Well No. 7 $450,000 <br />Optional Alternate Storage 2.0 million gallons <br />$1,250,000 <br />_' <br />4 <br />Complete Raw Water Mains from Wells No. 1, No. 2, <br />No. 3, No. 5, and No. 6 to reservoirs including revision <br />to well pumps <br />2012 <br />$1,425,000 <br />5 <br />Strengthen Trunk Water Main (_Phase 2 <br />2011 <br />$790,000 <br />6 <br />Strengthen Trunk Water Main (Phase 3) <br />2015 <br />$175,000 <br />7 <br />Construction of Treatment Plant <br />20t7 <br />$9,050,000 <br />8 <br />Strengthen Trunk Water Main (Phase 4) <br />2020 + <br />$570,000 <br />9 <br />Improve Distribution Water Main - Southwest Corner <br />(Phase 5) <br />2025 + <br />$1,200,000 - <br />10 <br />Construction of Well No. 8 with Pumphouse $800,000 <br />2029 + <br />$1,800,000 - <br />Includmg Raw Water Main for Wells No. 4, <br />No 8, and No. 9 $1,000,000 <br />11 <br />Construction Well No. 9 with Pumphouse and Raw <br />Water Main <br />2035 <br />$800,000 <br />are m zwr sonars <br />Water Treatment -Plant Study <br />29 13843.000 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.