Laserfiche WebLink
• <br />• <br />• <br />8. Side slope of the wetland mitigation area be no steeper than 6:1 horizontal to <br />vertical. <br />9. Site access for maintenance reasons must be shown on the plan for storm <br />water treatment areas. <br />10. Staff recommends that the above staff and any Environmental Board <br />recommendations be forwarded to the Planning and Zoning Board for <br />consideration: <br />Attachments <br />1. Main Street Village Cover Sheet <br />2. Existing Conditions and Resource Inventory <br />3. Preliminary Plat <br />4. Preliminary Site Plan <br />5. Preliminary Site Plan <br />6. Preliminary Utility Plan <br />7. Preliminary Utility Plan <br />8. Preliminary Grading and Erosion Control Plan <br />9. Preliminary Grading and Erosion Control Plan <br />10. Preliminary Grading and Erosion Control Plan <br />11. Preliminary Landscape Plan <br />12. Preliminary Landscape Details <br />13. Preliminary Biofiltration Details <br />14. Preliminary Biofiltration Details <br />15. Preliminary Lighting Plan <br />