My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/11/1999 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1999
>
01/11/1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/11/2014 1:53:14 PM
Creation date
8/8/2014 10:25:28 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/11/1999
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: DECEMBER 9, 1998 <br />.Estimate Voucher Number: <br />CITY OF LINO LAKES PROJ. NO.: <br />OSM Project Number: <br />LINO LAKES <br />0 <br />CITY OF LINO LAKES <br />CHANGE ORDER 1 <br />Total To Date <br />Quantity Units <br />0 <br />0. <br />U <br />O1 <br />0 <br />Item Spec No <br />00 <br />'0 <br />O rein <br />A M 0N O 0 O <br />4, CO Y1 N ▪ co <br />e- p .O <br />N O sO N M <br />�- IA N N <br />► O. I, 00 1. ., .4- I, .- 0 <br />.O r O. `1' I10 <br />O 4, <br />4, <br />1 �0 A O. MO O v M co N- O • CO a (0 A ~�pp P PJ —�pp IOA N co O <br />O OD �O N O .0 N P. M <br />.O ., 1A Al Al 441. <br />I.. O. 00 1- .- — .- .- O <br />'0 CO • .* !f_ <br />I, <br />S • ,�0 M P O O'er IA CO N 4, CO <br />le- p p ~p I�gp l IA N ▪ 0 O • CO <br />00 .O N O .O N P. M <br />.0 I, IA N N �f <br />• O- O O O M a an 00 'O M <br />O IA O O IA 43 M 7 N .- 0 <br />O 00 • O M N O CO O LA �O .O N 1 M <br />44 44 44 <br />�O N N �T <br />5 5555 <br />a Zp Z Q°> iQ a a a a <br />8 5- 0 H J N N <br />•-- O� t� O. e- 8 <br />00 .8 a d fM� • <br />1 <br />W <br />0 <br />O <br />et <br />et <br />INSTALL 24" CULVERT <br />TOPSOIL BORROW <br />GRANULAR FOUNDATION <br />EASEMENT GRADING <br />J <br />PREPARE BASKEBALL COURT <br />SUBCUT TRAIL IN WETLAND <br />PREPARE COURT & PLAY AREA <br />- M IA LO a 0 �-- <br />lr- <br />N <br />A <br />w <br />a <br />N <br />VP <br />44 <br />TOTAL CHANGE ORDER 1 <br />S 304,416.33 <br />$ 65,119.54 <br />Total To Date <br />01 <br />U <br />a <br />0 <br />1- <br />V <br />i+ <br />C <br />W <br />a <br />w <br />O <br />CO <br />a <br />CHANGE ORDER 2 <br />Quantity Units <br />0 - N 0 Os <br />a O <br />r <br />M4, <br />555 <br />5n. a. <br />(SECOND AVENUE) <br />CS <br />z <br />0. <br />N <br />VALVE BOX REPAIRS <br />INFRA-SHIELD <br />MN <br />w <br />TOTAL CHANGE ORDER 2 <br />$ 309,739.62 <br />$ 274,949.27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.