Laserfiche WebLink
Development Contract <br />Clearwater Creek 3`d Addn. — Phase One <br />develop in streets to prevent the public from traveling on same and directing <br />attention to detours. If and when the streets become impassable, such streets <br />shall be barricaded and closed. The developer shall maintain a smooth, hard <br />driving surface and adequate drainage on all temporary streets. The <br />Developer shall promptly clear dirt and debris resulting from construction <br />by the Developer, its agents or assigns within five (5) days after notification <br />by the City. <br />14. Street Lighting: <br />a) Residential street lighting shall be owned by the City. Such street <br />lighting system shall be installed, operated, and maintained by the <br />electric utility company. City and electric utility company may enter <br />into a contractual agreement on the rate and maintenance of the <br />street lighting system. <br />b) It shall be the responsibility of the Developer to pay for street <br />lighting operation charges for the initial 15 months of operation of <br />the system. <br />15. The Developer shall dedicate to the City, prior to approval of the final plat, <br />at no cost to the City, all permanent or temporary easements necessary for <br />the construction and installation of the Developer' s Improvements as <br />determined by the City. All such easements required by the City shall be in <br />writing, in recordable form, containing such terms and conditions as the City <br />shall determine. <br />16. The Developer shall be responsible for securing all site grading and <br />development approvals and permits from all appropriate Federal, State, <br />Regional and Local jurisdictions prior to the commencement of site grading <br />or construction and prior to the City awarding construction contracts for <br />public utilities. <br />17. The Developers shall make provision that all gas, telephone, cable TV and <br />electric utility designs be submitted to the City for review and approval prior <br />to construction of the streets. Following review and approval by the City, <br />the Developer shall insure that all installation comply with applicable City, <br />County and State design standards and show proof of security arrangements <br />with said utility companies. <br />18. Cost of Developer's Improvements, description and completion dates are as <br />shown on Attachment A. <br />page 5 <br />