My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09/27/1999 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1999
>
09/27/1999 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2014 1:27:16 PM
Creation date
8/14/2014 10:30:04 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/27/1999
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />AGENDA ITEM rJ�f <br />STAFF ORIGINATOR: John Powell, City Engineer <br />COUNCIL MEETING DATE: September 27, 1999 <br />TOPIC: Resolution No. 99 - 91 — Receive Bids and Award Construction Contract, <br />77th Street Utility Extension <br />VOTE REQUIRED: Simple Majority <br />BACKGROUND: <br />Sealed bids were received and opened earlier today for the 77th Street Utility Extension <br />Project. The results of the bid opening are presented below. City Council action is <br />required to award a construction contract to the lowest responsible bidder. <br />Company <br />Dave Perkins Contracting, Inc. <br />Penn Contracting , Inc. <br />Volk Sewer and Water, Inc. <br />W. B. Miller, Inc. <br />Engineer's Estimate <br />Bid Amount <br />$ 81,761.00 <br />$ 82,486.70 <br />$ 92,679.25 <br />$ 96,282.65 <br />$ 91,434.00 <br />The low bid is approximately 11% below the Engineer's Estimate for this project. A copy <br />of the complete bid tabulation is attached. Funding for the project will be through <br />special assessments levied against benefiting properties as property owners connect to <br />the utility system and the City's Area and Unit Fund. <br />The completion date for the utility installation is October 31, 1999, and the final <br />completion date for this project is November 15, 1999. <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 99 -91, accepting bids and awarding a construction <br />contract to Dave Perkins Contracting, Inc. for the 77th Street Utility Extension <br />project. <br />3. Not adopt Resolution No. 99 -91. <br />RECOMMENDATION: <br />Staff recommends that Resolution Number 99 -91 be adopted <br />
The URL can be used to link to this page
Your browser does not support the video tag.