Laserfiche WebLink
02/05/98 THU 09:46 FAX 6124644568 CITY OF LINO LAKES <br />,FEE—E1671998 913F, CITY OF L INO LEES <br />612 464 455E <br />4 003 <br />P.04/05 <br />1 r VJ <br />r,u4 <br />6. Ft vidc =wet to pewees the stusllty aware &chervil dowastfIto /lie3t,PaulWatertSrifirylake <br />reservoir system. <br />}• Allow tar dal praetorg aE'a wain variety &native plait spates Oat w.,uld allow for a demoatoation of <br />planning artdprotaotbsn of specks ottleivateandptatdielandsiatt re-establish nativeprairievegetation <br />slDOg the canister/ and instant bin- diversity relative le fisheries tr.d wi:fiife soneenu. <br />1. The developnensof2S,000 linear feet ofttailwhichwouldeanneetURI Creek Chain *CLANRe al <br />Perk with Clsetwtter Creek 'Mika Hardwood Creek trail. Wi allow &meccas& to amend), secured 80 sere <br />open space pate pared referred to as Clest+wder Creek Park. <br />If. Content <br />A. Significance: Project is in conformance with eta:e -wide effort to coaaatregionat park and trail systems. <br />Aka is In conformance with efforts to protect and enhance water resntueo related systems as directed by the <br />Metropolitan Surface Water Management Act. <br />B. Santegy: Primary theirs/ N <br />Seconds). locus B. C. F. J, L. hi, and O. <br />C. nuns: No years — possibly longer. depending on property aequf3ltiort time line. <br />D. Budget History: Mrs gummy corridor project is a concept that has recce tdy bean developed and no LCIAR <br />monies have been previously utilized for the implementation of this or cry other mimed project in this area <br />Some maim, however, have been emplaced for the Clearwater Creek Corridor, including: <br />1. Clomwater Creek Storms Water Management pica • (S2O,000) <br />2- Rice Creek Upper Watershed Impoundment Steady {3SO,C00) <br />3. Dald Eagle indultrial Park Study . (325,000) <br />4. Building giver Community Recreational Rcxive Planting in the Metropolitan Mississippi Corridor <br />(S ihnimowa) <br />3. Rica Creek Watershed DiStrict Diagnostic Feasibility Study Canterilllefreltici Lake - ($37,000) <br />6. Wetland improvements. <br />lY. Cooperation <br />1, City dilutor Provide pia litZni, engineering, and dollars for land acquit :lion sad construction. <br />2. City Stine Lakcc Provide ptaoulog, mg nerinB, end funding for land ecquiiitioo and caesavetion. <br />3. City of Centerville: Provide Iced through &volatiles atoSieitioo. <br />4. Rim Creak Watershed District: Provide engineering services, hyd.oiogio expertise and some cost -share <br />funding In an araonntyet to be determined. <br />5, Anoka County Perk Dopaitmeat: Provide planning aaslsataee tektite to corridor Improvements. <br />6. Department of Natural Resourcex Planning ossistance regarding fish rd w#Idflfe enhancements/ native <br />vegettttiOn nxooratton. <br />7. Washington County Parka Department Coordinate County 'hall systemm lecess to this vae:tway Corridor. <br />V. Location <br />This work wire benefit the Cities of aioo, Lino Lakes, and Centerville and inks and Washington Counties. <br />rtarae+etaczsiaeeaute <br />