My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/23/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
02/23/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 1:20:23 PM
Creation date
8/18/2014 1:15:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
02/23/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7A <br />STAFF ORIGINATOR: David Ahrens, Public Works Director /City Engineer <br />DATE: February 23, 1998 <br />TOPIC: <br />INTRODUCTION: <br />Resolution No. 98-19 - Town Center Parkway Phase 2 - <br />Approve Plans and Specifications and Order Advertisement <br />to Receive Bids. <br />The City is proposing to extend Town Center Parkway and utilities to serve the new <br />City Hall, Police Station and Early Learning Center on the Town Center Site. The <br />proposed street will be 26 feet wide with 24 inch gutters. The narrower street and <br />wider gutters will give the parkway a more urban feel. An 8 foot wide path will be <br />extended along the south side of the parkway. The sewer and water mains will be <br />extended to serve the City complex. <br />BACKGROUND: <br />This project is a continuation of the Town Center development. The improvements <br />associated with the City project for street and utility extensions will be necessary to <br />serve the municipal center area. This project will precede the building construction to <br />allow access to the site. <br />SCHEDULE: <br />The phase 2 Town Center Parkway construction is scheduled as follows: <br />Advertise to receive bids <br />Receive Bids <br />Award Contract <br />Preconstruction Meeting <br />Utility Construction Begins <br />Street Construction Begins <br />Estimated Construction Completion <br />February 25, 1998 <br />March 27, 1998 <br />April 13, 1998 <br />April 20, 1998 <br />April 27, 1998 <br />June 1, 1998 <br />August 1, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.