Laserfiche WebLink
Extension of Bids <br />TOWN CENTER PARKWAY <br />OWNER PROJECT <br />LINO LAKES, MINNESOTA <br />CITY OF LINO LAKES <br />)ER <br />ERACTING <br />8286,908.00 <br />Item Total <br />0 <br />0 <br />0 <br />0 <br />N <br />C) <br />0 <br />0 <br />C <br />0 <br />O <br />1- <br />21,360.001 <br />0 <br />0 <br />10 <br />C) <br />0 <br />0 <br />0 <br />N <br />O <br />L- <br />0 <br />0 <br />W <br />a <br />m <br />0 <br />0 <br />I0 <br />C) <br />N <br />C) <br />10,000.001 <br />0 <br />0 <br />0 <br />O <br />CO <br />m <br />0 <br />0 <br />0 <br />N <br />N <br />0 <br />0 <br />0 <br />0 <br />CD <br />m <br />0 <br />0 <br />0 <br />I0 <br />CO <br />0 <br />0 <br />0 <br />0 <br />O <br />0 <br />N <br />m <br />0 <br />0 <br />0 <br />m <br />0 <br />0 <br />C) <br />M <br />o <br />0 <br />0 <br />0 <br />10 <br />0 <br />0 <br />O <br />0 <br />0 <br />0 <br />0 <br />a <br />a <br />3,800.001 <br />00 <br />0 <br />m <br />0 <br />0 <br />0 <br />0 <br />10 <br />N <br />0 <br />N <br />N <br />O <br />O <br />00 <br />a <br />a <br />11 <br />.= <br />00 <br />0 <br />O <br />2,000.00 <br />00.000.2 <br />00'00 L <br />00'e <br />00'09 <br />00'OL <br />COD <br />a <br />3.00 <br />00'9L <br />COD <br />- <br />O <br />0 <br />0 <br />6TH BIDDER <br />KOBER EXCAVATING <br />Total Bid: 8271,027.14 <br />Unit Price Item Total <br />3,000.001 <br />360.001 <br />0 <br />O <br />C) <br />0 <br />.- <br />0 <br />O <br />O <br />0 <br />ID <br />900.001 <br />0 <br />0 <br />co <br />DD <br />N <br />N <br />10,000.001 <br />4,960.00`` <br />0 0 <br />O 0 <br />0 0 <br />10 ID <br />co 0) <br />C) a <br />0 0 <br />O O <br />0 m <br />ID a <br />m a <br />C) C) <br />.- <br />x <br />N <br />N <br />0 <br />O <br />0 <br />CO <br />N <br />a <br />a <br />0 <br />O <br />0) <br />0) <br />0 <br />O <br />0 <br />0 <br />o <br />N <br />.- <br />7,497.001 <br />0 <br />0 <br />0 <br />m <br />N <br />00 <br />O <br />0 <br />I0 <br />00 <br />O <br />)0 <br />C1 <br />100'8L <br />I00'£L <br />00'9 L <br />1 460.001 <br />N <br />- <br />0 0 0 0 <br />O O <br />0 0 <br />0.. <br />0 - <br />00 00 <br />O O <br />10 0 <br />lD <br />- <br />00 a <br />O N <br />ID <br />lap <br />C) <br />00 <br />N. <br />. <br />CO <br />0 <br />0 <br />. <br />0 <br />C) <br />0 <br />0 <br />0 <br />L- <br />5TH BIDDER <br />KADLEC EXCAVATING <br />Total Bid: 8286,742.63 <br />Unit Price Item Total <br />0 <br />O <br />0 <br />O <br />to <br />N <br />200.001 <br />17,080.001 <br />0 <br />O <br />0).- <br />m <br />0 <br />O <br />0 <br />O <br />O <br />O <br />.- <br />6,478.001 <br />0 0 <br />0 0 <br />0 0 <br />0 0 <br />0 0 <br />O C) <br />.- <br />0 C) <br />0 0 • <br />0 0 <br />0) <br />C) <br />1D <br />0 0 <br />0 0 <br />0 0 <br />0 <br />C) C) <br />ID a <br />L- <br />24.001 <br />0 <br />10 <br />N <br />ID <br />N <br />10 <br />N <br />376.001 <br />0 <br />O <br />O <br />co <br />CD <br />10 <br />0 <br />O <br />O <br />0 <br />O <br />N <br />00 <br />O <br />I0 <br />N <br />00 <br />O <br />0 <br />N <br />20.00 <br />0 <br />0 <br />0 <br />.- <br />L0'0 <br />00'099 <br />2.20 <br />10,000.00 <br />2,000.00 <br />m <br />0 <br />O 0 <br />0- <br />0 N <br />C` <br />00 <br />a <br />7.26 <br />IIDD <br />N <br />00'0 L <br />Oa <br />N <br />1,200.00 <br />Item Spec No Description Quantity Unit <br />EACH <br />EACH <br />LIN FT <br />UN FT _.._ <br />CU YD <br />EACH <br />POUND <br />LUMP SUM <br />ACRE <br />TREE <br />[ACRE <br />TREE <br />[CU YD <br />LIN FT <br />} <br />J <br />U <br />L <br />Z <br />.1 <br />CU YD <br />OA DS <br />ACRE <br />N <br />- <br />a <br />LO <br />CO <br />^ <br />�OOL <br />N <br />2490 <br />.- 0) <br />C) <br />77 <br />3.3 <br />n 0 <br />N 0 <br />10 <br />m <br />0 <br />0) <br />10 <br />0 <br />10 <br />0 <br />0 <br />N <br />2460 <br />HYDRANT <br />CONNECT TO EXISTING WATER MAIN <br />10" WATER MAIN -DUCT IRON CL 62 <br />8" WATER MAIN -DUCT IRON CL 62 <br />COARSE FILTER AGGREGATE (LV) <br />8" GATE VALVE AND BOX <br />co <br />0 <br />2 <br />LL <br />Z <br />O <br />Cr <br />w <br />IF, <br />0 <br />0 <br />j 2 <br />Li 2i <br />0 0 <br />CLEARING <br />GRUBBING <br />GRUBBING <br />COMMON EXCAVATION <br />REMOVE CURB AND GUTTER <br />COMMON BORROW (LV) <br />SAWING BIT PAVEMENT (FULL DEPTH) <br />TOPSOIL BORROW ILV) <br />Z <br />5 <br />0 <br />CO <br />SEEDING <br />m <br />. <br />O <br />10 <br />1D <br />N <br />100 <br />10 <br />m <br />N <br />m <br />a. <br />O <br />10 <br />10 <br />N <br />m <br />0 <br />10 <br />10 <br />N <br />1D 110 <br />1p <br />a 0) <br />N N <br />m <br />O <br />0 <br />ID <br />N <br />100 100 <br />0 4 0 <br />N <br />O <br />N N <br />100 100 <br />0 0 <br />N N <br />100 1100 <br />0 0 <br />N N <br />1100 110 <br />0 0 <br />N N <br />10 110 <br />0 0 <br />N N <br />100 <br />0- <br />I0 <br />N <br />III <br />. <br />0- <br />ID <br />N <br />1p <br />C) <br />(D <br />C) <br />N <br />C) <br />CO <br />C) <br />0) O <br />0 a <br />a <br />N C) <br />a a <br />a 10 <br />a a <br />(0 C• <br />a a <br />CO 0) <br />a a <br />0 .- <br />10 0 <br />N <br />1p <br />C) <br />1p <br />