My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/26/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
05/26/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 12:25:33 PM
Creation date
8/19/2014 10:41:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/26/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7A <br />STAFF ORIGINATOR: David Ahrens, Public Works Director /City Engineer <br />DATE: May 27, 1997 <br />TOPIC: Resolution No. 98 - 70, Accept Bids and Award Construction <br />Contract -1998 Sealcoat Project <br />INTRODUCTION: <br />Sealed bids were received and opened on Tuesday, May 19, 1998, for the 1998 <br />Sealcoat Project. City Council action is required to award a construction contract <br />to the lowest responsible bidder. <br />BACKGROUND: <br />The City Council ordered the improvement for 1998 Sealcoat Project at the April <br />27, 1998, Council Meeting. On May 19, 1998, two sealed bids were received <br />and opened with the following results: <br />Company Bid Amount <br />Allied Blacktop Company $55,912.50 <br />Asphalt Surface Technologies Corporation $61,312.50 <br />Engineer's estimate $75,000.00 <br />Sealcoat projects typically do not receive a high number of bids. Two years ago <br />one bid was submitted. Allied has submitted an excellent bid to the City for the <br />work. Allied Blacktop has performed sealcoat projects for the City in the past <br />and has completed the work satisfactorily. <br />FINANCING SUMMARY: <br />The 1998 budget include $58,850 for the 1998 Sealcoat Project. This is <br />approximately $3,000 more than the low bid by Allied Blacktop. <br />PROJECT SCHEDULE: <br />The project specifications state that the project must be complete (except for <br />final street sweeping) by August 15, 1998 and once work is started the <br />contractor must complete the project within 7 days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.