My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/26/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
05/26/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 12:25:33 PM
Creation date
8/19/2014 10:41:25 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/26/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY. -20' 98 (WED) 14:32 <br />Planning & Zoning Board <br />May 13, 1998 <br />Page 2 <br />********** *1* * ****** <br />V. ACTION ITEMS <br />TEL:612 421 9511 P.002 <br />A. Collova Builders, Rezone & Preliminary Plat, 250 & 260 Linda Avenue <br />This item had been tabled at the March 11, 1998, Planning and Zoning meeting, after <br />closing the Public Hearing. The actual motion called for tabling the item "until such time <br />as adequate sewer capacity is determined, a wetland delineation is provided, and a <br />neighborhood meeting is held." <br />The City Engineer has determined that adequate capacity does exist in the sewer main <br />serving these properties. The wetland on the site has been delineated and determined to <br />consist of the existing ponding area. A drainage and grading plan has been submitted for <br />review and approval by the City Engineer. A neighborhood meeting was held to discuss <br />concerns of the adjoining property owners. <br />Ms. Wyland explained that this request requires action on three items. The rezoning, the <br />preliminary plat, and the interim MUSA reserve. <br />Tony Sampair, representative for Mr. Collova, explained to the Board that Collova <br />Builders has completed all the items outlined by the Planning and Zoning Board at the <br />March 11, 1998, Planning and Zoning meeting. Mr. Sampair noted that per the <br />neighborhood meeting the proposed lot dimensions had changed. Regarding the wetland <br />delineation, it had been shown that the development would not be a negative impact. The <br />City Engineer has approved the sewer capacity. Collova Builders has received a UPA <br />letter for approval. They have also applied for a permit from the Rice Creek Watershed <br />and should receive the permit by the end of the month. <br />Chair Schaps asked what issues had been discussed at the neighborhood meeting. Mr. <br />Sampair explained that the issues discussed were lot width, maintaining the character of <br />the neighborhood, garage location at 260 Linda Avenue, and drainage. Mr. Sampair <br />stated that their lots far exceeded the square footage and depth requirements of the R -1X <br />zoning, which would in fact maintain the character of the neighborhood. Collova Builders <br />have maximized the lots as much as possible, turning the corner lot around which <br />eliminates the need for a variance. The builder does have a plan regarding the garage <br />location at 260 Linda Avenue. They also have a plan to alleviate the water and drainage <br />problem. <br />Mr. Dunn asked why Collova Builders had withdrawn the offer pursuing the R-1 X <br />rezoning. Mr. Sampair indicated that they had never pursued that option because the <br />proposed square footage far exceeds the lot requirements of R 1X. <br />Mr. Dunn questioned the physical size of the lots and building permits. Mr. Sampair <br />indicated that R 1X zoning involved executive homes and the homes Collova Builders will <br />be building are not priced at an executive level. <br />
The URL can be used to link to this page
Your browser does not support the video tag.