Laserfiche WebLink
Estimated Sewer Rehabilitation Costs <br />City of Lino Lakes, Minnesota <br />SEH No. A- LINOL9716.01 <br />No. <br />Item <br />Unit <br />Estimated <br />Quantity <br />Unit Price <br />Total Estimated <br />Price <br />1 <br />Mobilization <br />L.S. <br />1 <br />$5,000.00 <br />$5,000.00 <br />2 <br />Traffic Control <br />L.S. <br />1 <br />$5,000.00 <br />$5,000.00 <br />3 <br />Class #5 (100% crushed) <br />Ton <br />25 <br />$10.00 <br />$250.00 <br />4 <br />Replacement Backfill (LV) <br />C.Y. <br />500 <br />$8.00 <br />$4,000.00 <br />5 <br />Crushed Rock Pipe Foundation <br />Ton <br />25 <br />$10.00 <br />$250.00 <br />6 <br />8" PVC SDR 35 Schedule 40 <br />Sanitary Sewer <br />L.F. <br />90 <br />$35.00 <br />$3,150.00 <br />7 <br />8" x 4" PVC Wye <br />Each <br />2 <br />$100.00 <br />$200.00 <br />8 <br />Seal Manholes <br />Each <br />9 <br />$500.00 <br />$4,500.00 <br />9 <br />Seal Sanitary Sewer Joint <br />Each <br />37 <br />$500.00 <br />$18,500.00 <br />10 <br />Sanitary Sewer Spot Lining <br />Each <br />6 <br />$1,000.00 <br />$6,000.00 <br />11 <br />Cleaning Sanitary Sewer Lines <br />and Manholes <br />L.F. <br />7,461 <br />$1.00 <br />$7,461.00 <br />12 <br />Pre - televising Sanitary Sewer <br />L.F. <br />7,461 <br />$.50 <br />$3,730.50 <br />13 <br />Reline 8" Sanitary Sewer <br />L.F. <br />747 <br />$37.00 <br />$27,639.00 <br />14 <br />Reline 10" Sanitary Sewer <br />L.F. <br />372 <br />$47.00 <br />$17,484.00 <br />15 <br />Re -open Sanitary Sewer <br />Services <br />Each <br />23 <br />$175.00 <br />$4,025.00 <br />16 <br />Post - televising Sanitary Sewer <br />L.F. <br />7,461 <br />$.50 <br />$3,730.50 <br />17 <br />Sanitary Sewer Castings <br />w/Infi- Shields <br />Each <br />60 <br />$450.00 <br />$27,000.00 <br />Total <br />$137,180.00 <br />F:WROIEC MLWINOLW116VII\COSTTAB.F24 <br />