My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
06/08/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 3:43:27 PM
Creation date
8/19/2014 11:54:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/08/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 3 <br />STAFF ORIGINATOR: Brian Wessel <br />DATE: <br />TOPIC: <br />6/8/98 <br />Industrial Incentives: Tax Increment Financing Policy <br />BACKGROUND: <br />Since 1995, when the Economic Development Tax Increment Financing District <br />1 -7 (Apollo Business Park) and 3 -1 (Clearwater Creek) were created, the city <br />experienced a boom in quality light industrial development. Six new industries, <br />with a total market value of $6.8 million, have moved into the Apollo Business <br />Park. Three industries, totaling $10 million, have built in Clearwater Creek. <br />For the first two years of the 10 -year TIF Districts, the city was subsidizing land <br />and assessments to qualified companies on a combination of "upfront" and "pay - <br />as- you -go" basis. This generally provided a company moving into the city equity <br />in the range of 16% of the total project cost. <br />As the districts have aged and diminished in capacity, the city is no longer able <br />to provide a subsidy in the range of 16 %. This limits the city's ability to attract <br />new business to the city while competing with neighboring cities that are offering <br />land in fully improved business parks, strong TIF incentives and good access to <br />the freeway systems. <br />Other factors also have produced a slow down in industrial development this <br />year in Lino Lakes: <br />• The remaining land in the Apollo Business Park abuts the Lino Lakes <br />Correctional Facility, which has been perceived negatively by some <br />prospects. <br />• Much of the remaining land in Clearwater Creek will not be accessible until <br />the new Otter Lake Road alignment is complete. <br />• The combination of low interest rates and low inflation brought an industrial <br />building boom in 1995 that is now slowing. The opportunistic phase of the <br />market cycle may be over. <br />As the "Industrial Park TIF Status" chart shows, the new businesses that have <br />been built since 1995 will be on the tax rolls between 1998 and 2004. <br />However, because of the slowdown of new industrial construction over the past <br />
The URL can be used to link to this page
Your browser does not support the video tag.