My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/08/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
06/08/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2014 3:43:27 PM
Creation date
8/19/2014 11:54:38 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/08/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - PROJECT ACTIVITIES & SCOPE <br />CITY OF LINO LAKES <br />The project activities and scope proposed by the city of Lino Lakes cover the rehabilitation of <br />MH structures and pipes within an area of the City, East of Reshanau Lake. Methods of <br />rehabilitation for the MH structures include, sealing MH structures and installation of "Infi- <br />shields". Methods of rehabilitation for the pipe include open cut replacement of pipe and service <br />wyes, isolated pipe joint sealing, isolated spot lining and longer segment lining. Activities within <br />the project scope include: <br />1. Chemically grout and seal 9 sanitary structures. <br />2. Installation of 60 "Infi- sheilds ". <br />3. Open cut replacement of approximately 90 feet of 8" sewer with PVC and installation of 2 <br />service wyes. <br />4. Seal 37 individual sanitary pipe joints. <br />5. Install short segment liners at 6 individual pipe spot locations. <br />6. Relining approximately 1,119 feet of existing 8" and 10" sanitary sewer pipes. <br />7. Various work related items including traffic control, installation of pipe foundation material, <br />system cleaning, pre and post construction televised inspections and re- establishment of <br />service connections. <br />8. Upon completion of all inspections, and review of inspection reports, a summary report will <br />be prepared. This report to include overall summary of completed project, description and <br />location of I/1 sources removed, and acknowledgment of certification requirement including <br />method, schedule with dates and locations. Report shall also include complete list of locations <br />where rehabilitative or re- constructive work was performed. <br />Project activities will be conducted using a combination of City Staff personnel, contracted <br />service vendors and consultant services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.