My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/27/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
07/27/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 12:06:41 PM
Creation date
8/20/2014 10:28:11 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/27/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 6C <br />STAFF ORIGINATOR; Brian Wessel <br />DATE: 7/27/98 <br />TOPIC: Consideration of Resolution No 98 -114, Accept Bids <br />and Award Contracts for Bid Package No 2, Civic <br />Complex <br />BACKGROUND: <br />Bid Package No 1 for the Lino Lakes Civic Complex includes all the construction <br />contracts for structural steel (erection only), asphalt paving, concrete and <br />masonry, miscellaneous metals (material only), casework, general construction, <br />roofing, aluminum windows and doors, drywall, tilework, acoustical ceilings/wall <br />panels, flooring, painting, metal lockers, partitions, mechanical, electrical and fire <br />protection. As you recall, Adolfson & Peterson (A &P), the construction manager, <br />separated the bid packages in response to the Early Childhood Center's <br />occupancy deadline. The first bid package Adolfson & Peterson supervised the <br />opening of the bids on Tuesday, July 21, 1998 at 2 p.m. at city hall. <br />The apparent lowest responsible bidders for Bid Package No 2 are listed in your <br />packet. The construction total of $6 million has been guaranteed. A &P will <br />complete additional value engineering of electrical and mechanical to ensure the <br />budget does not exceed $6 million. A list of alternates has also been developed <br />to ensure the project remains within budget. <br />OPTIONS: <br />1. Adopt Resolution No. 98 -114 accepting the bids and awarding the contracts <br />for Bid Package No 2, Civic Complex <br />2, Receive the bids but delay the contract award pending further review by city <br />staff and Adolfson & Peterson <br />RECOMMENDATION: <br />Option 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.