My WebLink
|
Help
|
About
|
Sign Out
Home
Search
07/27/1998 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
1998
>
07/27/1998 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 12:06:41 PM
Creation date
8/20/2014 10:28:11 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
07/27/1998
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AGENDA ITEM 7A <br />STAFF ORIGINATOR: David Ahrens, Public Works Director /City Engineer <br />DATE: July 21, 1998 <br />TOPIC: Resolution No 98 -115, Accept Bids and Award Construction <br />Contract -1998 Wear Course and Trail Paving Project <br />INTRODUCTION: <br />Sealed bids were received and opened on Friday July 21, 1998 for 1998 Wear Course <br />and Trail Paving project. City Council action is required to award a construction contract <br />to the lowest responsible bidder. <br />BACKGROUND: <br />The City Council ordered the 1998 Wear Course and Trail Paving project at the June 22, <br />1998 Council Meeting, On July 21, 1998, two sealed bids were received and opened with <br />the following results. <br />Company Bid Amount <br />North Valley, Inc. <br />Midwest Asphalt Corp. <br />Engineer's Estimate <br />$ 235,414.50 <br />$ 349,783.10 <br />$ 329,346.50 <br />The number of bids received represents the late bid timing for the 1998 construction <br />season. The bid by North Valley, Inca is approximately 291, below the engineer's <br />estimate. The attached letter from the City's consulting engineer, OSM, Inc., <br />recommends the award of the construction contract to North Valley, Inc. <br />FINANCING SUMMARY: <br />The construction costs for this project will be paid for from assessments to developers, <br />the park trail fund and street department. The projected cost split for the project is as <br />follows: <br />Wear Course Paving $155,210.10 <br />Trail Paving $ 54,367.15 <br />Second Avenue $ 25,795.75 <br />Total $235,414.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.