Laserfiche WebLink
r, a Join# irs Apreereent <br />es and conditions between <br />will be on the county high <br />Drive, shall become a <br />sting Apollo Drive 'located to th <br />unty highway system so it %al tc <br />my system. Lilac Street v become a end <br />it to have <br />The Agreement t ihst access shall be limited to four along the Apollo Drive, <br />phase 3 align r nt. This lncl dr • vays for the bank that is being <br />const ed, th+ nv ienc a store site, the north half of the VFW property , and` <br />the r (see <br />attached a chi }. Th so th of the UAW prop y w l a p+ a eve <br />via Lilac Street. Cone development pattern in this area and at <br />roadway an arteri al road, staff feels that the number of access points is <br />satisfactory. <br />The project cost (including engin and#mintive costs) ki at <br />$505,504. Of that portion the estimated County portion is $317,464 and the City <br />portion is $188,040. The City is planning to fund its portion through special <br />assessments to benefiting properties and the Surface Water Management Fund. <br />1. Return to f %then <br />2. Adopt Resolution Numb s <br />with Anoka bounty for the <br />Mayor and City C$e rtc to si <br />3. Adopt Resolution Number 98 -125 with <br />r Join <br />, P1 <br />as <br />Number 98 ;- <br />