Laserfiche WebLink
A summary of the estimated costs to be reimbursed by the Metropolitan Council <br />is shown on Exhibit A of the agreement and is presented below: <br />I -35E Crossing <br />Item Metropolitan Council Lino Lakes <br />Construction Cost $ 35,100 (90 %) $ 3,900 <br />Design Engineering $ 2,808 (8 %) 0 <br />Construction Observation $ 2,106 (6 %) 0 <br />Subtotal $ 40,014 $ 3,900 <br />Otter Lake Road Crossing <br />Item Metropolitan Council Lino Lakes <br />Construction Cost $ 15,614.10 (100 %) 0 <br />Design Engineering $ 1,249.13 (8 %) 0 <br />Construction Observation $ 936.85 (6 %) 0 <br />Subtotal $ 17,800.00 0 <br />Total <br />$ 57, 814.08 $ 3,900.00 <br />OPTIONS: <br />1. Return to staff for further review. <br />2. Adopt Resolution Number 98 -164 approving the Joint Powers Agreement <br />with the Metropolitan Council for the 135E Area Projects and to authorize the <br />Mayor and City Clerk to sign the Agreement. <br />3. Adopt Resolution Number 98 —164 with revisions as suggested by Council. <br />RECOMMENDATION: <br />Staff recommends to Council to adopt Resolution Number 98 -164. <br />