Laserfiche WebLink
• <br />• <br />• <br />9. All timing of the new and existing Traffic <br />Control Signals will be determined by the State, and no changes <br />may be made except with the approval of the State. <br />10. The State will, for System "A" and for the <br />existing traffic control signals on County State Aid Highway No. <br />14 at County Road No. 84 (Otter Lake Road) and at County State <br />Aid Highway No. 54 (20th Avenue), provide the necessary labor, <br />material and equipment to maintain and keep in repair the <br />traffic control signal cabinets and control equipment, repair <br />knockdowns of the new and existing Traffic Control Signal <br />systems and perform all other traffic control signal and street <br />light maintenance not performed by the County, Lino Lakes or <br />Centerville, and will be responsible for the timing and <br />operation of the new Traffic Control Signal on County State Aid <br />Highway No. 14 at 21st Avenue (System "A ") and for the existing <br />Traffic Control Signals and on County State Aid Highway No. 14 <br />at County Road No. 84 (Otter Lake Road) and at County State Aid <br />Highway No. 54 (20th Avenue) . <br />11. Upon completion of any Traffic Control Signal <br />work performed under this agreement for System "A" and for the <br />existing Traffic Control Signals on County State Aid Highway No. <br />14 at County Road No. 84 (Otter Lake Road) and at County State <br />Aid Highway No. 54 (20th Avenue), the State will submit to the <br />County a detailed invoice in duplicate listing all labor, <br />equipment and materials used. <br />94607M <br />-8- <br />