My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2009-061 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2009
>
2009-061 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 1:08:23 PM
Creation date
8/27/2014 11:39:00 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
08/24/2009
Council Meeting Type
Regular
Resolution #
09-61
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />2009 SURFACE WATER MANAGEMENT PROJECTS TKDA <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14292.004 ENGINE GRIN; • 1,,3 f1nE(I IRE • Al ANGINA <br />The right tlme. The right pea The eight eemPenSt <br />BIDS OPENED: AUGUST 14, 2009, AT 10:00 A.M. <br />"DENOTES ERROR IN BIDDERS CALCULATION C.W. HOULE, INC. REHBEIN COMPANIES <br />ITEM UNIT TOTAL UNIT TOTAL <br />NO. DESCRIPTION QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT <br />• <br />• <br />f <br />0 <br />O <br />co <br />69 <br />$ 1,000.00 <br />$ 215.00 <br />$ 4,100.00 <br />$ 460.00 <br />$ 1,700.00 <br />$ 750.00 <br />O CO <br />O N <br />0 a <br />C9 C• <br />m <br />A <br />co <br />P <br />CO <br />N <br />$ 8,400.00 <br />$ 3,740.00 <br />$ 600.00 <br />$ 1,750.00 <br />$ 2,976.00 <br />$ 1,008.00 <br />$ 3,810.00 <br />$ 825.00 <br />$ 2,970.00 <br />$ 2,448.00 <br />$ <br />210.00 <br />O <br />A <br />CO <br />W <br />O <br />in <br />H <br />$ 415.00 <br />$ 585.00 <br />$ 453.00 <br />$ 1,194.00 <br />$ 2,880.00 <br />$ 284.00 <br />$ 420.00 <br />$ 984.00 <br />00'06L $ <br />00'09L'Z $ <br />00'005'£ $ <br />$ 16,585.00 <br />O <br />O <br />O <br />W <br />69 <br />$ 1,000.00 <br />$ 215.00 <br />$ 20.50 <br />$ 460.00 <br />0 0 <br />O O <br />1.:0 <br />.0- <br />f9 69 <br />$ 3.00 <br />$ 2.65 <br />$ 420.00 <br />$ 34.00 <br />$ 600.00 <br />$ 1,750.00 <br />$ 62.00 <br />$ 21.00 <br />$ _ 127.00 <br />$ 16.50 <br />$ 49.50 <br />0 0 <br />CO 0 <br />00 <br />N <br />C9 f9 <br />$ 415.00 <br />$ 6.50 <br />1 $ 453.00 <br />$ 99.50 <br />$ 360.00 <br />0 <br />0 <br />CO <br />69 <br />U.) <br />h <br />.- <br />69 <br />$ 21.00 <br />$ 32.80 <br />$ 175.00 <br />$ 138.00 <br />$ 790.00 <br />O <br />O <br />O <br />W <br />69 <br />$ 850.00 <br />$ 1,500.00 <br />$ 1,400.00 <br />$ 800.00 <br />O O <br />O 0 <br />O O <br />CO O CO <br />CO 69 <br />00'00l' l $ <br />00.00Z' l $ <br />O <br />0 <br />O <br />O <br />O) <br />N <br />$ 7,000.00 <br />$ 2,090.00 <br />$ 930.00 <br />$ 1,710.00 <br />$ 2,448.00 <br />$ 288.00 <br />$ 3,030.00 <br />$ 150.00 <br />$ 1,140.00 <br />O O <br />0 0 <br />O O <br />0 <br />03. O <br />49 69 <br />$ 22,686.00 <br />$ 1,000.00 <br />$ 450.00 <br />$ 600.00 <br />$ 156.00 <br />$ 504.00 <br />O <br />0 <br />O <br />U) <br />V) <br />4l <br />O <br />0 <br />0 <br />69 <br />$ 120.00 <br />$ 810.00 <br />$ 4,600.00 <br />$ 2,060.00 <br />$ 750.00 <br />14 984.00 <br />$ 950.00 <br />$ 850.00 <br />$ 1,500.00 <br />0 0 <br />0 O <br />h0 <br />0 <br />0 <br />69 69 <br />$ 8.00 <br />$ 132.00 <br />00'00l' l $ <br />00'9 $ <br />$ 350.00 <br />$ 19.00 <br />$ 930.00 <br />$ 1,710.00 <br />$ 51.00 <br />$ 8.00 <br />$ 101.00 <br />$ 3.00 <br />$ _ 19.00 <br />0 0 <br />0 0 <br />a)O <br />O <br />f9 69 <br />0 0 0 <br />0 0 0 <br />O1nO <br />0 0 <br />O 0 <br />E9 69 CQQ9 <br />$ 13.00 <br />$ 83.00 <br />0 <br />0 <br />I) <br />CO <br />0 <br />CO <br />0 <br />0 <br />vi <br />69 <br />$ 6.00 <br />$ 27.00 <br />$ 230.00 <br />$ 103.00 <br />$ 750.00 <br />� I <br />LS <br />EA <br />LF <br />EA <br />�U <br />SY <br />LS <br />PROJECT 2 - TOMAHAWK TR AND CHIPPEWA TR DITCH REPAIR <br />CO j <br />Q <br />EA <br />EA <br />LF <br />LF <br />CY <br />LF <br />CY <br />SY <br />LS <br />C/)>- W <br />LF <br />LF <br />111 <br />-1 <br />LF <br />TN <br />TN <br />CY <br />LS <br />•-• •- <br />200 <br />1 <br />OO <br />200 <br />1 <br />00 <br />N . <br />1 <br />1 <br />48 <br />48 <br />30 <br />50 <br />60 <br />m' <br />W <br />E - • <br />1, <br />90 <br />1 <br />12 <br />8 <br />N <br />20 <br />30 <br />20 <br />20 <br />1 <br />PROJECT 1 - ROHAVIC LANE <br />MOBILIZATION <br />ROCK CONSTRUCTION ENTRANCE <br />CLEAN /OPEN STORM SEWER OUTFALL <br />CLEAN STORM SEWER PIPE <br />CLEAR AND GRUB TREE (4" DIA OR GREATER) <br />REGRADE DITCH <br />CLASS III RIPRAP W/ FABRIC <br />EROSION CONTROL BLANKET CATEGORY 3 <br />SEED / RESTORATION <br />SUBTOTAL PROJECT 1 <br />CLEAR AND GRUB TREE (4" DIA OR GREATER) <br />COMMON BORROW (FILL OVER PIPE) <br />SALVAGE AND REINSTALL 30" FES <br />STORM SEWER MANHOLE, TYPE 409 <br />30" RCP STORM SEWER, CLASS 3 <br />TRENCH STABILIZATION ROCK / PIPE BEDDING <br />CLASS III RIPRAP W/ FABRIC <br />SILT FENCE <br />TOPSOIL BORROW FOR EXISTING YARD AREA <br />SOD FOR EXISTING YARD AREA <br />SEED / RESTORATION OVER NEW PIPE <br />SUBTOTAL PROJECT 2 <br />PROJECT 3 - FAWN LANE EQUILIZER PIPE <br />MOBILIZATION <br />REMOVE BITUMINOUS PAVEMENT <br />CLEAR AND GRUB TREE (4" DIA OR GREATER) <br />REMOVE STORM SEWER PIPE <br />128" X 18" RCP ARCH SEWER <br />,PLACE BENTONITE AROUND PIPE (MATERIAL SUPPLIED) <br />TRENCH STABILIZATION ROCK / PIPE BEDDING <br />AGGREGATE BASE CLASS 5 (6" DEPTH) <br />,BITUMINOUS WEAR COURSE (2" DEPTH) <br />CLASS III RIPRAP W/ FABRIC <br />SEED / RESTORATION <br />[SUBTOTAL PROJECT 3 <br />N C')NI' <br />O <br />O h <br />00 <br />•- <br />NCO <br />O O4-U)a) <br />" <br />'- N CO <br />V7 CC) <br />CO <br />C` <br />00 <br />°�" <br />I <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.