My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2009-073 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2009
>
2009-073 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2014 2:32:04 PM
Creation date
8/27/2014 12:49:55 PM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
10/05/2009
Council Meeting Type
Regular
Resolution #
09-73
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />III. COSTS <br />A. The contract cost of the work, or if the work is not contracted, the cost of all labor, <br />materials, reimbursable utility relocations, normal engineering costs and equipment rental <br />required to complete the work shall constitute the actual "construction costs" and shall be <br />so referred to herein. "Estimated costs" are good faith projections of costs which will be <br />incurred for the Project. Actual costs may vary from the estimated costs and actual costs <br />are what the parties are responsible for. <br />B. Participation in the cost of the final design for the Project is as follows: <br />1. The estimated fmal design costs for the Project are $912,500 as shown in the <br />attached Exhibit A. <br />2. The Project has been awarded an appropriation of federal funds for fmal design. <br />i. Federal HPP funds capped at $730,000. <br />3. The County shall pay One Hundred percent (100 %) of the remaining final design <br />cost after federal funds have been applied. The cost to the County is $182,500. <br />C. Participation in the cost of land acquisition for the Project is as follows: <br />• 1. The estimated land acquisition costs for the Project are $5,600,000 as shown in . <br />the attached Exhibit A. <br />• <br />2. The County shall pay for forty percent (40 %) of the cost of the land acquisition. <br />The cost to the County is $2,240,000. <br />3. The City shall pay for sixty percent (60 %) of the cost of the land acquisition. The <br />cost to the City is $3,360,000. <br />D. Participation in the cost of construction for the Project is as follows: <br />1. The estimated construction costs for the Project are $14,000,000 as shown in the <br />attached Exhibit A. <br />2. The Project has been awarded two amounts of federal funds for construction. <br />i. Federal STP funds capped at $5,775,000 (20% local match required). <br />ii. Federal ARRA funds capped at $6,825,000. <br />3. The County agrees to contribute forty percent (40 %) to the remaining <br />construction cost after federal and state funds have been applied. The estimated <br />local cost (total cost less federal and state funds) of the construction is $1,435,000 <br />as shown in Exhibit A. The cost to the County is $574,000. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.