Laserfiche WebLink
• <br />4. Parking lot lighting must be completed as shown on submitted plan and fixture cut <br />sheets. The pedestal for a light near the Lake Drive driveway is not included on the <br />lighting plan. If a light is to be installed here, it must be determined what type of <br />fixture and a photometric study done to ensure it meets city standards. <br />5. Parking lot and sign lighting shall comply with the hours of operation for commercial <br />businesses as regulated by the zoning code. <br />6. If the installed flagpole lighting is to remain or be expanded, a photometric analysis <br />must be submitted that demonstrates it meets city standards. Landscaping around the <br />flagpoles must be revised on a new plan for the area if lighting is to be there. <br />7. Signage is governed by the City's sign ordinance and permits are required for all <br />signs. The location of any ground sign must be identified on a plan. <br />8. If parking or traffic generation create safety problems in the future, the City may <br />revisit the CUP and consider adding additional conditions to resolve such issues such <br />as traffic control personnel or other measures. The City may call a review meeting of <br />representatives from law enforcement officers, the church, and the neighborhood to <br />review traffic issues and ascertain the need for providing traffic control or other <br />reasonable measures, which the church shall provide. This condition is in lieu of <br />requiring a traffic study for the church use. <br />9. The parking, landscaping, and any other exterior work shall be completed in <br />accordance with the plans. <br />10. Final site grading and erosion control must be completed in accordance with the <br />approved plans. This includes removal of the old building foundation/slab, re- <br />shooting elevations, grading the rest of the south end of the site and the county <br />roadway ditch to the design criteria, and finishing grading of the rest of the site. <br />11. The south parking lot curbing and drainage improvements must be completed <br />according to plans. <br />12. The south parking lot sub -base and first lift of asphalt must be completed according to <br />plans. <br />13. In the area of the existing access to the back yard of the property to the east, any <br />alterations necessary to ensure proper drainage and other compliance with plans must <br />be made as directed by the City Engineer. <br />14. The final lift of asphalt must be completed over the entire site according to plans. <br />15. Topsoil, landscaping, and seeding of all disturbed areas must be completed according <br />to plans. <br />October 12, 2009 <br />North Springs Church Performance Agreement Page 8 of 10 <br />