My WebLink
|
Help
|
About
|
Sign Out
Home
Search
2009-101 Council Resolution
LinoLakes
>
City Council
>
City Council Resolutions
>
2009
>
2009-101 Council Resolution
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2014 11:16:28 AM
Creation date
8/28/2014 11:01:13 AM
Metadata
Fields
Template:
City Council
Council Document Type
Resolutions
Meeting Date
11/23/2009
Council Meeting Type
Regular
Resolution #
09-101
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO. 1 November 6, 2009 <br />2009 SURFACE WATER MANAGEMENT PROJECT <br />OITY OF LINO LAKES, MINNESOTA <br />KDA PROJECT NO. 14292.004 <br />ITEM <br />NO. <br />DESCRIPTION <br />CONTRACT UNIT CONTRACT <br />UNIT QUANTITY PRICE AMOUNT <br />DEDUCT THESE ITEMS <br />PROJECT 4 - WEST SHADOW LAKE DRIVE CROSSING <br />2 CLEAN /,OPEN STORM SEWER OUTFALL EA 1 $ (500.00) $ (500.00) <br />5 REGRADE DITCH LF 150 $ (25.00) $ (3,750.00) <br />SUBTOTAL PROJECT 4 $ (4,250.00) <br />ADD THESE ITEMS <br />PROJECT 6 - APOLLO MEADOWS TOWNHOMES <br />9 CLEAR AND GRUB TREE (4" DIA OR GREATER) EA 2 $ 200.00 $ 400.00 <br />10 COMMON BORROW (FILL OVER PIPE) CY 48 $ 10.00 $ 480.00 <br />SUBTOTAL PROJECT 6 $ 880.00 <br />PROJECT 7 - LOIS LANE <br />10 CLEAN STORM SEWER PIPE <br />SUBTOTAL PROJECT 7 <br />LF <br />PROJECT 8 - BLACKBIRD LANE <br />4 EROSION CONTROL BLANKET CATEGORY 3 <br />SUBTOTAL PROJECT 8 <br />PROJECT 10 - JAMES STREET <br />7 CLASS III RIPRAP W/ FABRIC <br />SUBTOTAL PROJECT 10 <br />SY <br />CY <br />50 $ 10.00 $ 500.00 <br />$ 500.00 <br />60 $ 2.00 $ 120.00 <br />$ 120.00 <br />2 $ 150.00 $ 300.00 <br />$ 300.00 <br />PROJECT 13 - BIRCH STREET TRENCH DRAIN <br />1 INSTALL TRENCH DRAIN IN CONCRETE LS 1 $ 4,500.00 $ 4,500.00 <br />2 CLASS II RIPRAP W/ FABRIC CY 5 $ 100.00 $ 500.00 <br />SUBTOTAL PROJECT 13 $ 5,000.00 <br />TOTAL CHANGE ORDER NO. 1 $ 2,550.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.